[n] Z. Nergiz, H. Aksakal, A. A. Aksoy, C. Kaya, and O. K. ?ûzt??rk, “Status of the Turkish Synchrotron Radiation Source Machine Design”, in Proc. IPAC'14, Dresden, Germany, Jun. 2014, pp. 313-315. doi:10.18429/JACoW-IPAC2014-MOPRO097
[n] B. Li et al., “Magnetic Field Measurement and Analysis for Drift Tube Linac of CSNS”, in Proc. LINAC'18, Beijing, China, Sep. 2018, pp. 738-740. doi:10.18429/JACoW-LINAC2018-THPO028
[n] J. A. Holmes, S. M. Cousineau, M. A. Plum, and J. G. Wang, “Computational Beam Dynamics Studies for Improving the Ring Injection and Extraction Systems in SNS”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper THPC015, pp. 3008-3010.
[n] A. L. Vamvakas et al., “Integration and Testing of 3 Consecutive CLIC Two-Beam Modules”, in Proc. IPAC'16, Busan, Korea, May 2016, pp. 3856-3858. doi:10.18429/JACoW-IPAC2016-THPOR033
[n] R. Hettel et al., “SPEAR 3 Upgrade Project: The Final Year”, in Proc. PAC'03, Portland, OR, USA, May 2003, paper TOPA005, pp. 235-237.
Use Complete Form