Favourites
For Word
[n] R. Tom?ís, “CLIC Overview”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper FR1RAI01, pp. 4195-4199.
[n] C. Montag, “RHIC Progress and Future”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper FR1PBI01, pp. 4216-4220.
[n] V. A. Dimov, E. Belli, G. Bellodi, J.-B. Lallement, A. M. Lombardi, and M. Yarmohammadi Satri, “Beam Commissioning of Linac4 up to 12 MeV”, in Proc. IPAC'15, Richmond, VA, USA, May 2015, pp. 3886-3889. doi:10.18429/JACoW-IPAC2015-THPF085
[n] R. Milner, “Overview of Electron-Ion Collider Initiatives”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper FR1PBI02, pp. 4221-4224.
[n] A. Chao, “Gravitational Instability of a Nonrotating Galaxy”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper FR2PBI02, pp. 4275-4279.
[n] A. D. Bross, “The Neutrino Factory ÔÇô The Final Frontier in Neutrino Physics?”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper FR3RBI04, pp. 4292-4296.
[n] V. Forte, C. Bracco, G. P. Di Giovanni, M. A. Fraser, A. M. Lombardi, and B. Mikulec, “Multi-Particle Simulations of the Future CERN PSB Injection Process with Updated Linac4 Beam Performance”, in Proc. HB'18, Daejeon, Korea, Jun. 2018, pp. 278-283. doi:10.18429/JACoW-HB2018-WEP2PO007
[n] S. J. Brooks, “Extending the Energy Range of 50Hz Proton FFAGs”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper FR5PFP025, pp. 4357-4359.
[n] G. Bezzon et al., “Construction and Commissioning of the RFQ for the CERN Lead-Ion Facility”, in Proc. LINAC'94, Tsukuba, Japan, Aug. 1994, paper TH-12, pp. 722-724.
[n] S. Bettoni et al., “Achievements in CTF3 and Commissioning Status”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper FR1RAC04, pp. 4210-4212.
[n] P. V. Drumm and Y. Suzuki, “Laser Stripping Injection for the ESS Accumulator Ring”, in Proc. EPAC'00, Vienna, Austria, Jun. 2000, paper MOP2A07, pp. 2234-2236.
[n] J.-B. Lallement, A. M. Lombardi, and P. A. Posocco, “Linac4 Beam Commissioning Strategy”, in Proc. HB'12, Beijing, China, Sep. 2012, paper TUO3B03, pp. 283-285.
[n] K. Ohmi, “Study of Coherent Head-tail Instablility Due to Beam-beam Interaction in Cirular Colliders Based on Crab Waist Scheme”, in Proc. eeFACT'16, Daresbury, UK, Oct. 2016, pp. 61-65. doi:10.18429/JACoW-eeFACT2016-TUT1BH2
[n] Z. P. Li, S. Dong, X. D. He, and C.-F. Wu, “Development of X-band Photonic Band Gap Accelerating Structure”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper WE6RFP103, pp. 3041-3043.
For LaTeX
Use Complete Form
For BibTeX
References
- R. Tom?ís, “CLIC Overview”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR1RAI01, pp. 4195-4199.
- C. Montag, “RHIC Progress and Future”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR1PBI01, pp. 4216-4220.
- V. A. Dimov, E. Belli, G. Bellodi, J.-B. Lallement, A. M. Lombardi, and M. Yarmohammadi Satri, “Beam Commissioning of Linac4 up to 12 MeV”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 3886-3889.
- R. Milner, “Overview of Electron-Ion Collider Initiatives”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR1PBI02, pp. 4221-4224.
- A. Chao, “Gravitational Instability of a Nonrotating Galaxy”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR2PBI02, pp. 4275-4279.
- A. D. Bross, “The Neutrino Factory ÔÇô The Final Frontier in Neutrino Physics?”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR3RBI04, pp. 4292-4296.
- V. Forte, C. Bracco, G. P. Di Giovanni, M. A. Fraser, A. M. Lombardi, and B. Mikulec, “Multi-Particle Simulations of the Future CERN PSB Injection Process with Updated Linac4 Beam Performance”, in Proc. 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'18), Daejeon, Korea, Jun. 2018, pp. 278-283.
- S. J. Brooks, “Extending the Energy Range of 50Hz Proton FFAGs”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR5PFP025, pp. 4357-4359.
- G. Bezzon et al., “Construction and Commissioning of the RFQ for the CERN Lead-Ion Facility”, in Proc. 1994 Linear Accelerator Conf. (LINAC'94), Tsukuba, Japan, Aug. 1994, paper TH-12, pp. 722-724.
- S. Bettoni et al., “Achievements in CTF3 and Commissioning Status”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper FR1RAC04, pp. 4210-4212.
- P. V. Drumm and Y. Suzuki, “Laser Stripping Injection for the ESS Accumulator Ring”, in Proc. 7th European Particle Accelerator Conf. (EPAC'00), Vienna, Austria, Jun. 2000, paper MOP2A07, pp. 2234-2236.
- J.-B. Lallement, A. M. Lombardi, and P. A. Posocco, “Linac4 Beam Commissioning Strategy”, in Proc. 52nd ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'12), Beijing, China, Sep. 2012, paper TUO3B03, pp. 283-285.
- K. Ohmi, “Study of Coherent Head-tail Instablility Due to Beam-beam Interaction in Cirular Colliders Based on Crab Waist Scheme”, in Proc. 58th ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e+e- Colliders (eeFACT'16), Daresbury, UK, Oct. 2016, pp. 61-65.
- Z. P. Li, S. Dong, X. D. He, and C.-F. Wu, “Development of X-band Photonic Band Gap Accelerating Structure”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper WE6RFP103, pp. 3041-3043.
Back to search