Favourites
For Word
[n] A. A. Mikhailichenko, “To the Ionization Cooling in a RF Cavity with Absorber”, in Proc. IPAC'12, New Orleans, LA, USA, May 2012, paper TUPPD014, pp. 1437-1439.
[n] R. M. Bodenstein, Y. Roblin, and M. G. Tiefenback, “Further Analysis of Real Beam Line Optics from a Synthetic Beam”, in Proc. IPAC'12, New Orleans, LA, USA, May 2012, paper TUPPC046, pp. 1269-1271.
[n] N. Milas et al., “ESS Commissioning Plans”, in Proc. HB'18, Daejeon, Korea, Jun. 2018, pp. 127-132. doi:10.18429/JACoW-HB2018-TUA1WD01
[n] J. E. Dusatko et al., “A 4 GS/sec Instability Feedback Processing System for Intra-bunch Instabilities”, in Proc. IPAC'13, Shanghai, China, May 2013, paper WEPME059, pp. 3067-3069.
[n] S. Mitsunobu et al., “Activities of Superconducting Cavities for KEK B-Factory”, in Proc. SRF'95, Gif-sur-Yvette, France, Oct. 1995, paper SRF95A08, pp. 47-49.
For LaTeX
Use Complete Form
For BibTeX
References
- A. A. Mikhailichenko, “To the Ionization Cooling in a RF Cavity with Absorber”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper TUPPD014, pp. 1437-1439.
- R. M. Bodenstein, Y. Roblin, and M. G. Tiefenback, “Further Analysis of Real Beam Line Optics from a Synthetic Beam”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper TUPPC046, pp. 1269-1271.
- N. Milas et al., “ESS Commissioning Plans”, in Proc. 61st ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'18), Daejeon, Korea, Jun. 2018, pp. 127-132.
- J. E. Dusatko et al., “A 4 GS/sec Instability Feedback Processing System for Intra-bunch Instabilities”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper WEPME059, pp. 3067-3069.
- S. Mitsunobu et al., “Activities of Superconducting Cavities for KEK B-Factory”, in Proc. 7th Int. Conf. RF Superconductivity (SRF'95), Gif-sur-Yvette, France, Oct. 1995, paper SRF95A08, pp. 47-49.
Back to search