Favourites
For Word
[n] C. M. Scoby, R. K. Li, J. T. Moody, and P. Musumeci, “Femtosecond RF Timing in Low Charge Photoinjectors”, in Proc. PAC'11, New York, NY, USA, Mar.-Apr. 2011, paper MOP287, pp. 654-656.
[n] R. I. Saban et al., “The Commissioning of the LHC Technical Systems”, in Proc. PAC'07, Albuquerque, NM, USA, Jun. 2007, paper FROAC03, pp. 3801-3803.
[n] V. Kain et al., “SPS Slow Extracted Spill Quality During the 2016 Run”, in Proc. IPAC'17, Copenhagen, Denmark, May 2017, pp. 627-630. doi:10.18429/JACoW-IPAC2017-MOPIK049
For LaTeX
Use Complete Form
For BibTeX
References
- C. M. Scoby, R. K. Li, J. T. Moody, and P. Musumeci, “Femtosecond RF Timing in Low Charge Photoinjectors”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper MOP287, pp. 654-656.
- R. I. Saban et al., “The Commissioning of the LHC Technical Systems”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper FROAC03, pp. 3801-3803.
- V. Kain et al., “SPS Slow Extracted Spill Quality During the 2016 Run”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 627-630.
Back to search