JaCoW Logo

Reference Search

Favourites


For Word

[n]	I. Podadera et al., “Manufacturing, Assembly and Tests of the LIPAc Medium Energy Beam Transport Line (MEBT)”, in Proc. LINAC'16, East Lansing, MI, USA, Sep. 2016, pp. 554-557. doi:10.18429/JACoW-LINAC2016-TUPLR041
[n]	B. L. Cohen, “Selection of Magnet Configuration for the ORIC”, in Proc. Cyclotrons'59, Oak Ridge, TN, USA, Jul. 1959, paper CYC59A05, pp. 15-17. 
[n]	R. L. Brown et al., “Resonance Control for the Coupled Cavity Linac and Drift Tube Linac Structures of the Spallation Neutron Source Linac Using a Closed-Loop Water Cooling System”, in Proc. PAC'01, Chicago, IL, USA, Jun. 2001, paper TPAH095, pp. 1429-1431. 
[n]	C. David, J. Jacob, A. Panzarella, J.-P. Perrine, and J.-L. Revol, “Commissioning of the Third RF Acceleration Unit for the ESRF Storage Ring”, in Proc. EPAC'98, Stockholm, Sweden, Jun. 1998, paper TUP02C, pp. 1755-1757. 
[n]	R. Li and R. L. Gluckstern, “Cavity Height Dependence of the Longitudinal Impedance for a Pillbox Cavity at High Frequency”, in Proc. LINAC'92, Ottawa, Canada, Aug. 1992, paper TH4-52, pp. 755-757. 
[n]	L. Maunoury et al., “SPIRAL1 Charge Breeder: Performances and Status”, in Proc. ECRIS'16, Busan, Korea, Aug.-Sep. 2016, pp. 35-38. doi:10.18429/JACoW-ECRIS2016-MOFO01
[n]	W. B. Powell, “The University of Birmingham Radial-Ridge Cyclotron”, in Proc. Cyclotrons'59, Oak Ridge, TN, USA, Jul. 1959, paper CYC59A04, pp. 12-14. 
[n]	N. Pichoff et al., “The SARAF-LINAC project July 2024 status”, in Proc. LINAC'24, Chicago, IL, USA, Aug. 2024, pp. 615-617. doi:10.18429/JACoW-LINAC2024-THAA007
[n]	N. M. King, “Spiral Ridge Studies at the University of Florida”, in Proc. Cyclotrons'59, Oak Ridge, TN, USA, Jul. 1959, paper CYC59A06, pp. 18-23. 

For LaTeX

Use Complete Form

For BibTeX

References

Back to search