Favourites
For Word
[n] C. Deibele et al., “Calibration of the analog beam-signal hardware for the credited engineered beam power limit system at the Proton Power Upgrade Project at the Spallation Neutron Source”, in Proc. LINAC'24, Chicago, IL, USA, Aug. 2024, pp. 718-721. doi:10.18429/JACoW-LINAC2024-THPB041
[n] Y. B. Yan et al., “White Rabbit Based Beam-Synchronous Timing Systems for SHINE”, in Proc. IPAC'22, Bangkok, Thailand, Jun. 2022, pp. 2415-2419. doi:10.18429/JACoW-IPAC2022-THIYGD1
[n] M. Juchno, “Magnetic Model of the CERN Proton Synchrotron Main Magnetic Unit”, in Proc. IPAC'11, San Sebastian, Spain, Sep. 2011, paper WEPO019, pp. 2439-2441.
[n] V. Danilov, J. D. Galambos, and J. A. Holmes, “Transverse Impedance Implementation in ORBIT”, in Proc. PAC'01, Chicago, IL, USA, Jun. 2001, paper TPPH040, pp. 1752-1754.
For LaTeX
Use Complete Form
For BibTeX
References
- C. Deibele et al., “Calibration of the analog beam-signal hardware for the credited engineered beam power limit system at the Proton Power Upgrade Project at the Spallation Neutron Source”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 718-721.
- Y. B. Yan et al., “White Rabbit Based Beam-Synchronous Timing Systems for SHINE”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 2415-2419.
- M. Juchno, “Magnetic Model of the CERN Proton Synchrotron Main Magnetic Unit”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper WEPO019, pp. 2439-2441.
- V. Danilov, J. D. Galambos, and J. A. Holmes, “Transverse Impedance Implementation in ORBIT”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper TPPH040, pp. 1752-1754.
Back to search