Favourites
For Word
[n] S. Wolff, “The Infrastructure for the TESLA Test Facility (TTF) - A Status Report”, in Proc. PAC'95, Dallas, TX, USA, May 1995, paper RPB09, pp. 680-682.
[n] T. A. Treado, P. Brown, S. Evans, and M. E. Marks, “CPI's 1.3 GHz, 90 kW Pulsed IOT Amplifier”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper THPEB061, pp. 4011-4013.
[n] D. L. Friesel, M. Ball, T. J. P. Ellison, and T. Sloan, “Multiple Beam Operations at IUCF”, in Proc. Cyclotrons'89, Berlin, Germany, May 1989, paper F7-02, pp. 380-383.
[n] Y. Hao, Y. Luo, V. Ptitsyn, and J. Qiang, “Frequency Choice Studies of eRHIC Crab Cavity”, in Proc. IPAC'17, Copenhagen, Denmark, May 2017, pp. 3028-3031. doi:10.18429/JACoW-IPAC2017-WEPIK047
[n] D. M. Gassner and T. Obina, “Closing Plenary Summary of Working Group 4 Instrumentation and Controls for ERL2011”, in Proc. ERL'11, Tsukuba, Japan, Oct. 2011, paper WG4000, pp. 105-109.
For LaTeX
Use Complete Form
For BibTeX
References
- S. Wolff, “The Infrastructure for the TESLA Test Facility (TTF) - A Status Report”, in Proc. 16th Particle Accelerator Conf. (PAC'95), Dallas, TX, USA, May 1995, paper RPB09, pp. 680-682.
- T. A. Treado, P. Brown, S. Evans, and M. E. Marks, “CPI's 1.3 GHz, 90 kW Pulsed IOT Amplifier”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper THPEB061, pp. 4011-4013.
- D. L. Friesel, M. Ball, T. J. P. Ellison, and T. Sloan, “Multiple Beam Operations at IUCF”, in Proc. 12th Int. Cyclotron Conf. and Their Applications (Cyclotrons'89), Berlin, Germany, May 1989, paper F7-02, pp. 380-383.
- Y. Hao, Y. Luo, V. Ptitsyn, and J. Qiang, “Frequency Choice Studies of eRHIC Crab Cavity”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 3028-3031.
- D. M. Gassner and T. Obina, “Closing Plenary Summary of Working Group 4 Instrumentation and Controls for ERL2011”, in Proc. 50th Advanced ICFA Beam Dynamics Workshop on Energy Recovery Linacs (ERL'11), Tsukuba, Japan, Oct. 2011, paper WG4000, pp. 105-109.
Back to search