Favourites
For Word
[n] T. H. Luo and D. Li, “Analysis of Transverse Field Induced by Curved Beryllium Window in Muon Ionization Cooling Cavity”, in Proc. IPAC'16, Busan, Korea, May 2016, pp. 457-459. doi:10.18429/JACoW-IPAC2016-MOPMW029
[n] F. J. Cullinan, R. Nagaoka, G. Skripka, and P. F. Tavares, “The Damping of Transverse Coherent Instabilities by Harmonic Cavities”, in Proc. IPAC'15, Richmond, VA, USA, May 2015, pp. 102-105. doi:10.18429/JACoW-IPAC2015-MOPWA011
[n] Y. Iino et al., “Fabrication Technique of Drift Tube with Permanent Quadrupole Magnet for the Linac of the JHP”, in Proc. LINAC'90, Albuquerque, NM, USA, Sep. 1990, paper MO429, pp. 123-125.
[n] Y. Luo and W. Fischer, “Computational Challenges for Beam-Beam Simulations for RHIC”, in Proc. HB'10, Morschach, Switzerland, Sep.-Oct. 2010, paper WEO2C02, pp. 521-523.
[n] S. Bettoni, P. Craievich, M. Pedrozzi, and S. Reiche, “Simulations of a Corrugated Beam Pipe for the Chirp Compensation in SwissFEL”, in Proc. FEL'13, New York, NY, USA, Aug. 2013, paper TUPSO04, pp. 214-218.
[n] P. N. Ostroumov et al., “Installation and On-Line Commissioning of EBIS at ATLAS”, in Proc. LINAC'16, East Lansing, MI, USA, Sep. 2016, pp. 1022-1026. doi:10.18429/JACoW-LINAC2016-FR1A02
[n] G. B. Shen, M. R. Kraimer, and L. Yang, “Prototype of Beam Commissioning Environment and its Applications for NSLS-II”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper WEPEB026, pp. 2740-2742.
For LaTeX
Use Complete Form
For BibTeX
References
- T. H. Luo and D. Li, “Analysis of Transverse Field Induced by Curved Beryllium Window in Muon Ionization Cooling Cavity”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 457-459.
- F. J. Cullinan, R. Nagaoka, G. Skripka, and P. F. Tavares, “The Damping of Transverse Coherent Instabilities by Harmonic Cavities”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 102-105.
- Y. Iino et al., “Fabrication Technique of Drift Tube with Permanent Quadrupole Magnet for the Linac of the JHP”, in Proc. 1990 Linear Accelerator Conf. (LINAC'90), Albuquerque, NM, USA, Sep. 1990, paper MO429, pp. 123-125.
- Y. Luo and W. Fischer, “Computational Challenges for Beam-Beam Simulations for RHIC”, in Proc. 46th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'10), Morschach, Switzerland, Sep.-Oct. 2010, paper WEO2C02, pp. 521-523.
- S. Bettoni, P. Craievich, M. Pedrozzi, and S. Reiche, “Simulations of a Corrugated Beam Pipe for the Chirp Compensation in SwissFEL”, in Proc. 35th Int. Free Electron Laser Conf. (FEL'13), New York, NY, USA, Aug. 2013, paper TUPSO04, pp. 214-218.
- P. N. Ostroumov et al., “Installation and On-Line Commissioning of EBIS at ATLAS”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 1022-1026.
- G. B. Shen, M. R. Kraimer, and L. Yang, “Prototype of Beam Commissioning Environment and its Applications for NSLS-II”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper WEPEB026, pp. 2740-2742.
Back to search