Favourites
For Word
[n] H. Maesaka, H. Dewa, T. Fujita, M. Masaki, and S. Takano, “Development and Performance Test of the BPM System for the SPring-8 Upgrade”, in Proc. IPAC'17, Copenhagen, Denmark, May 2017, pp. 265-267. doi:10.18429/JACoW-IPAC2017-MOPAB066
[n] S. Seletskiy et al., “Experience with First Turns Commissioning in NSLS-II Storage Ring”, in Proc. IPAC'15, Richmond, VA, USA, May 2015, pp. 1950-1952. doi:10.18429/JACoW-IPAC2015-TUPMA053
[n] C. Zhang et al., “Front-End Linac Design and Beam Dynamics Simulations for MYRRHA”, in Proc. LINAC'12, Tel Aviv, Israel, Sep. 2012, paper THPB005, pp. 849-851.
[n] D. Zhou et al., “Impedance Calculation and Simulation of Microwave Instability for the Main Rings of SuperKEKB”, in Proc. IPAC'14, Dresden, Germany, Jun. 2014, pp. 1600-1602. doi:10.18429/JACoW-IPAC2014-TUPRI021
For LaTeX
Use Complete Form
For BibTeX
References
- H. Maesaka, H. Dewa, T. Fujita, M. Masaki, and S. Takano, “Development and Performance Test of the BPM System for the SPring-8 Upgrade”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 265-267.
- S. Seletskiy et al., “Experience with First Turns Commissioning in NSLS-II Storage Ring”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1950-1952.
- C. Zhang et al., “Front-End Linac Design and Beam Dynamics Simulations for MYRRHA”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper THPB005, pp. 849-851.
- D. Zhou et al., “Impedance Calculation and Simulation of Microwave Instability for the Main Rings of SuperKEKB”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 1600-1602.
Back to search