Favourites
For Word
[n] J. Bosser, G. Ferioli, J. Koopman, and J. Mann, “Beam Transfer Monitors for the Operation of the SPS with Oxygen”, in Proc. PAC'87, Washington D.C., USA, Mar. 1987, pp. 732-735.
[n] Y. Kawase and M. Inoue, “Neutron Factory Project at KURRI”, in Proc. APAC'98, Tsukuba, Japan, Mar. 1998, paper 4D012, pp. 104-106.
[n] F. Perez, B. Bravo, A. Salom, and P. Sanchez, “Commissioning of the ALBA Storage Ring RF System”, in Proc. IPAC'11, San Sebastian, Spain, Sep. 2011, paper MOPC045, pp. 178-180.
[n] C. Mitsuda et al., “Suppression of Horizontal Beam Oscillation by using Fast Kicker Magnet System in SPring-8 Storage Ring”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper WEPEA031, pp. 2552-2554.
[n] A. Taketani et al., “Development of Un-destructive Inspection System for Large Concrete Infrastructure by using Accelerator Based Compact Neutron Source”, in Proc. IPAC'15, Richmond, VA, USA, May 2015, pp. 2262-2264. doi:10.18429/JACoW-IPAC2015-TUPWI009
[n] L. Malina et al., “Comparison of Optics Measurement Methods in ESRF”, in Proc. IPAC'16, Busan, Korea, May 2016, pp. 3343-3346. doi:10.18429/JACoW-IPAC2016-THPMB045
[n] M. Gasior, G. Baud, J. Olexa, and G. Valentino, “First Operational Experience with the LHC Diode ORbit and OScillation (DOROS) System”, in Proc. IBIC'16, Barcelona, Spain, Sep. 2016, pp. 43-46. doi:10.18429/JACoW-IBIC2016-MOPG07
[n] H. Padamsee et al., “Overview of the Cornell ERL Injector Cryomodule”, in Proc. SRF'03, Lübeck, Germany, Sep. 2003, paper TUP24, pp. 348-350.
For LaTeX
Use Complete Form
For BibTeX
References
- J. Bosser, G. Ferioli, J. Koopman, and J. Mann, “Beam Transfer Monitors for the Operation of the SPS with Oxygen”, in Proc. 12th Particle Accelerator Conf. (PAC'87), Washington D.C., USA, Mar. 1987, pp. 732-735.
- Y. Kawase and M. Inoue, “Neutron Factory Project at KURRI”, in Proc. 1st Asian Particle Accelerator Conf. (APAC'98), Tsukuba, Japan, Mar. 1998, paper 4D012, pp. 104-106.
- F. Perez, B. Bravo, A. Salom, and P. Sanchez, “Commissioning of the ALBA Storage Ring RF System”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPC045, pp. 178-180.
- C. Mitsuda et al., “Suppression of Horizontal Beam Oscillation by using Fast Kicker Magnet System in SPring-8 Storage Ring”, in Proc. 1st Int. Particle Accelerator Conf. (IPAC'10), Kyoto, Japan, May 2010, paper WEPEA031, pp. 2552-2554.
- A. Taketani et al., “Development of Un-destructive Inspection System for Large Concrete Infrastructure by using Accelerator Based Compact Neutron Source”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 2262-2264.
- L. Malina et al., “Comparison of Optics Measurement Methods in ESRF”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 3343-3346.
- M. Gasior, G. Baud, J. Olexa, and G. Valentino, “First Operational Experience with the LHC Diode ORbit and OScillation (DOROS) System”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 43-46.
- H. Padamsee et al., “Overview of the Cornell ERL Injector Cryomodule”, in Proc. 11th Workshop RF Superconductivity (SRF'03), Lübeck, Germany, Sep. 2003, paper TUP24, pp. 348-350.
Back to search