Favourites
For Word
[n] M. A. Drury et al., “Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project”, in Proc. LINAC'12, Tel Aviv, Israel, Sep. 2012, paper MOPB030, pp. 237-239.
[n] D. J. Kelliher, S. Machida, D. C. Plostinar, C. R. Prior, and S. L. Sheehy, “Plans for a Linear Paul Trap at Rutherford Appleton Laboratory”, in Proc. IPAC'15, Richmond, VA, USA, May 2015, pp. 2590-2593. doi:10.18429/JACoW-IPAC2015-WEPWA041
[n] A. Bartalesi, “The XBPM Project at MAX IV Frontends, Overview and First Results”, in Proc. MEDSI'18, Paris, France, Jun. 2018, pp. 340-342. doi:10.18429/JACoW-MEDSI2018-THPH03
[n] C. M. Baffes et al., “Installation Progress at the PIP-II Injector Test at Fermilab”, in Proc. NAPAC'16, Chicago, IL, USA, Oct. 2016, pp. 722-725. doi:10.18429/JACoW-NAPAC2016-WEPOA15
For LaTeX
Use Complete Form
For BibTeX
References
- M. A. Drury et al., “Performance of First C100 Cryomodules for the CEBAF 12 GeV Upgrade Project”, in Proc. 26th Linear Accelerator Conf. (LINAC'12), Tel Aviv, Israel, Sep. 2012, paper MOPB030, pp. 237-239.
- D. J. Kelliher, S. Machida, D. C. Plostinar, C. R. Prior, and S. L. Sheehy, “Plans for a Linear Paul Trap at Rutherford Appleton Laboratory”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 2590-2593.
- A. Bartalesi, “The XBPM Project at MAX IV Frontends, Overview and First Results”, in Proc. 10th Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation Conf. (MEDSI'18), Paris, France, Jun. 2018, pp. 340-342.
- C. M. Baffes et al., “Installation Progress at the PIP-II Injector Test at Fermilab”, in Proc. North American Particle Accelerator Conf. (NAPAC'16), Chicago, IL, USA, Oct. 2016, pp. 722-725.
Back to search