[n] M. E. Schulze, “Commissioning Results of the LLUMC Beam Switchyard and Gantry”, in Proc. PAC'91, San Francisco, CA, USA, May 1991, pp. 610-613.
[n] M. Steck et al., “Recent Results on Equilibrium Temperatures and Cooling Forces with Electron Cooled Heavy Ion Beams in the ESR”, in Proc. EPAC'94, London, UK, Jun.-Jul. 1994, pp. 1197-1200.
Use Complete Form