[n] C.-J. Jing, W. Gai, A. Kanareykin, W. Liu, and J. G. Power, “34.272 GHz Multilayered Dielectric-Loaded Accelerating Structure”, in Proc. PAC'05, Knoxville, TN, USA, May 2005, paper TPAE018, pp. 1592-1594.
[n] H. S. Vora et al., “Master Slave Topology Based, Remotely Operated, Precision X-ray Beam Profiler and Placement System for High Pressure Physics Experiment at Indus-2 Beam Line”, in Proc. PCaPAC'12, Kolkata, India, Dec. 2012, paper THCD04, pp. 128-130.
[n] P. Li, W. Bai, H. Wang, and X. Li, “Beam Line Design at the CAEP THz Free Electron Laser”, in Proc. IPAC'13, Shanghai, China, May 2013, paper TUPWO029, pp. 1937-1939.
Use Complete Form