JaCoW Logo

Reference Search

Favourites


For Word

[n]	G. H. Gillespie, W. Hill, and G. H. Gillespie Associates, “An Innovative Graphic User Interface for PARMILA 2”, in Proc. LINAC'08, Victoria, Canada, Sep.-Oct. 2008, paper MOP099, pp. 305-307. 
[n]	M. H. Moscatello, C. Berthe, C. Jamet, and G. Normand, “Machine Protection System for the SPIRAL2 Facility”, in Proc. IPAC'12, New Orleans, LA, USA, May 2012, paper WEPPD044, pp. 2612-2614. 
[n]	C.-J. Jing et al., “A 26 GHz Dielectric Based Wakefield Power Extractor”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper WE6RFP060, pp. 2930-2932. 
[n]	M. Kreider et al., “Launching the FAIR Timing System with CRYRING”, in Proc. PCaPAC'14, Karlsruhe, Germany, Oct. 2014, paper TCO304, pp. 152-154. 
[n]	N. Orr et al., “On Line Isotopic Separator Test Benches at GANIL”, in Proc. PAC'93, Washington D.C., USA, Mar. 1993, pp. 1792-1795. 
[n]	A. R. Donaldson and J. R. Ashton, “SLAC Modulator Availability and Impact on SLC Operation”, in Proc. PAC'95, Dallas, TX, USA, May 1995, paper RPB05, pp. 668-670. 
[n]	V. Anashin et al., “Photodesorption and Power Testing of the SR Crotch-Absorber for BESSY-II”, in Proc. EPAC'98, Stockholm, Sweden, Jun. 1998, paper TUP06D, pp. 2163-2165. 
[n]	M. Kuntzsch et al., “Commissioning of the new ps timing system at ELBE”, presented at the IPAC'24, Nashville, TN, USA, May 2024, paper TUPS79, unpublished. 
[n]	R. C. York and C. Reece, “RF Steering in the CEBAF CW Superconducting Linac”, in Proc. PAC'87, Washington D.C., USA, Mar. 1987, pp. 1307-1310. 
[n]	R. Bossart et al., “Tune Measurement and Control at the CERN-SPS”, in Proc. PAC'85, Vancouver, Canada, May 1985, pp. 1902-1905. 
[n]	C. Barthe-Dejean, F. Lutton, and M. Michel, “Seismic Analysis for Safety Requirements of SPIRAL2 Accelerator”, in Proc. LINAC'22, Liverpool, UK, Aug.-Sep. 2022, pp. 252-254. doi:10.18429/JACoW-LINAC2022-MOPORI11

For LaTeX

Use Complete Form

For BibTeX

References

Back to search