Warning
The page numbers for some of these references could not be added automatically. You must provide the page numbers from the original proceedings which is located at JACoW.org, and substitute ‘pp. XX-XX’ with the correct page numbers.
Favourites
For Word
[n] T. Watanabe et al., “Commissioning of the Beam Energy Position Monitor System for the Superconducting RIKEN Heavy-ion Linac”, in Proc. IBIC'20, Santos, Brazil, Sep. 2020, pp. 295-302. doi:10.18429/JACoW-IBIC2020-FRAO04
[n] J.-L. Biarrotte et al., “Commissioning of the MAX 700 MHz Test Stand”, in Proc. LINAC'14, Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP080, pp. 610-612.
[n] D. Vandeplassche et al., “Integrated Prototyping in View of the 100 MeV Linac for Myrrha Phase 1”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 661-664. doi:10.18429/JACoW-IPAC2018-TUPAF003
[n] J. Alessi et al., “Design of the BNL Super Neutrino Beam Facility”, in Proc. APAC'04, Gyeongju, Korea, Mar. 2004, paper THP21002, pp. XX-XX.
[n] D. B. Blackwell, V. W. Brown, G. A. Ekeroth, T. O. McGill, and W. L. Rogers, “Application of a Relational Data Base for Documenting the Ground Test Accelerator Cable Routing and Wiring Interconnections”, in Proc. LINAC'90, Albuquerque, NM, USA, Sep. 1990, paper TU467, pp. 496-498.
[n] M. Zhang, D. Gu, Q. Gu, D. Huang, and Z. Wang, “Commissioning Experience and Beam Optimization for DCLS Linac”, in Proc. IPAC'17, Copenhagen, Denmark, May 2017, pp. 1509-1512. doi:10.18429/JACoW-IPAC2017-TUPAB083
[n] J. D. Fox et al., “Operation and Performance of a Longitudinal Damping System using Parallel Digital Signal Processing”, in Proc. EPAC'94, London, UK, Jun.-Jul. 1994, pp. 1619-1622.
[n] P. Bellomo et al., “SPEAR 3 DC Magnet Power Supplies - An Overview”, in Proc. APAC'04, Gyeongju, Korea, Mar. 2004, paper MOP10004, pp. XX-XX.
[n] C. Darve et al., “ESS SRF Linear Accelerator Components Preliminary Results and Integration”, in Proc. IPAC'17, Copenhagen, Denmark, May 2017, pp. 3666-3669. doi:10.18429/JACoW-IPAC2017-THOBB3
For LaTeX
Use Complete Form
For BibTeX
References
- T. Watanabe et al., “Commissioning of the Beam Energy Position Monitor System for the Superconducting RIKEN Heavy-ion Linac”, in Proc. 9th Int. Beam Instrumentation Conf. (IBIC'20), Santos, Brazil, Sep. 2020, pp. 295-302.
- J.-L. Biarrotte et al., “Commissioning of the MAX 700 MHz Test Stand”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP080, pp. 610-612.
- D. Vandeplassche et al., “Integrated Prototyping in View of the 100 MeV Linac for Myrrha Phase 1”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 661-664.
- J. Alessi et al., “Design of the BNL Super Neutrino Beam Facility”, in Proc. 3rd Asian Particle Accelerator Conf. (APAC'04), Gyeongju, Korea, Mar. 2004, paper THP21002, pp. XX-XX.
- D. B. Blackwell, V. W. Brown, G. A. Ekeroth, T. O. McGill, and W. L. Rogers, “Application of a Relational Data Base for Documenting the Ground Test Accelerator Cable Routing and Wiring Interconnections”, in Proc. 1990 Linear Accelerator Conf. (LINAC'90), Albuquerque, NM, USA, Sep. 1990, paper TU467, pp. 496-498.
- M. Zhang, D. Gu, Q. Gu, D. Huang, and Z. Wang, “Commissioning Experience and Beam Optimization for DCLS Linac”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 1509-1512.
- J. D. Fox et al., “Operation and Performance of a Longitudinal Damping System using Parallel Digital Signal Processing”, in Proc. 4th European Particle Accelerator Conf. (EPAC'94), London, UK, Jun.-Jul. 1994, pp. 1619-1622.
- P. Bellomo et al., “SPEAR 3 DC Magnet Power Supplies - An Overview”, in Proc. 3rd Asian Particle Accelerator Conf. (APAC'04), Gyeongju, Korea, Mar. 2004, paper MOP10004, pp. XX-XX.
- C. Darve et al., “ESS SRF Linear Accelerator Components Preliminary Results and Integration”, in Proc. 8th Int. Particle Accelerator Conf. (IPAC'17), Copenhagen, Denmark, May 2017, pp. 3666-3669.
Back to search