[n] N. R. Neveu, W. Gai, C.-J. Jing, J. G. Power, and L. K. Spentzouris, “Staged Two Beam Acceleration Beam Line Design for the AWA Facility”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 1688-1691. doi:10.18429/JACoW-IPAC2018-TUPML064
[n] J. Seeman et al., “Design of an Asymmetric Super-B Factory”, in Proc. EPAC'06, Edinburgh, UK, Jun. 2006, paper MOPLS047, pp. 646-648.
Use Complete Form