[n] I. Gorgisyan et al., “Commissioning of Beam Instrumentation at the CERN AWAKE Facility After Integration of the Electron Beam Line”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 1993-1996. doi:10.18429/JACoW-IPAC2018-WEPAF070
[n] M. Suetake, H. Koiso, Y. Ohnishi, and K. Oide, “Continuous Circumference Control and Timing System for Simultaneous Electron-positron Injection at the KEKB”, in Proc. EPAC'06, Edinburgh, UK, Jun. 2006, paper THPCH116, pp. 3074-3076.
Use Complete Form