Favourites
For Word
[n] M. A. Rehman et al., “Beam Control and Monitors for the Spiral Injection Test Experiment”, in Proc. IPAC'19, Melbourne, Australia, May 2019, pp. 2557-2560. doi:10.18429/JACoW-IPAC2019-WEPGW038
[n] Y. C. Chen et al., “Optimization and Upgrade of Slow Extraction Control System for HIRFL CSR Main Ring”, in Proc. ICALEPCS'17, Barcelona, Spain, Oct. 2017, pp. 1663-1665. doi:10.18429/JACoW-ICALEPCS2017-THPHA122
[n] N. Iida et al., “Commissioning of Positron Damping Ring and the Beam Transport for SuperKEKB”, in Proc. eeFACT'18, Hong Kong, China, Sep. 2018, pp. 152. doi:10.18429/JACoW-eeFACT2018-TUPAB07
For LaTeX
Use Complete Form
For BibTeX
References
- M. A. Rehman et al., “Beam Control and Monitors for the Spiral Injection Test Experiment”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 2557-2560.
- Y. C. Chen et al., “Optimization and Upgrade of Slow Extraction Control System for HIRFL CSR Main Ring”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 1663-1665.
- N. Iida et al., “Commissioning of Positron Damping Ring and the Beam Transport for SuperKEKB”, in Proc. 62nd ICFA Advanced Beam Dynamics Workshop on High Luminosity Circular e+e- Colliders (eeFACT'18), Hong Kong, China, Sep. 2018, pp. 152.
Back to search