Favourites
For Word
[n] R. W. Garnett et al., “Status of the LANSCE Front-End Upgrade”, in Proc. NAPAC'13, Pasadena, CA, USA, Sep.-Oct. 2013, paper MOPMA14, pp. 327-329.
[n] S. A. Watson, G. R. Jennings, and D. C. Moir, “RF Phase Measurement at Phermex Using Time-To-Digital Converters”, in Proc. PAC'89, Chicago, IL, USA, Mar. 1989, pp. 1591-1593.
[n] J. S. Kolski, “Proposed Varying Amplitude Raster Pattern to Uniformly Cover Target for the Isotope Production Facility (IPF) at LANSCE”, in Proc. HB'14, East Lansing, MI, USA, Nov. 2014, paper MOPAB46, pp. 148-150.
[n] R. W. Garnett, S. S. Kurennoy, J. F. O, L. Rybarcyk, and A. Schempp, “Progress towards an RFQ-based Front End for LANSCE”, in Proc. IPAC'11, San Sebastian, Spain, Sep. 2011, paper WEPS068, pp. 2658-2660.
[n] R. W. Garnett et al., “LANSCE H+ RFQ Status”, in Proc. IPAC'15, Richmond, VA, USA, May 2015, pp. 4073-4075. doi:10.18429/JACoW-IPAC2015-THPF148
[n] T. H. Luo, P. D. McChesney, P. E. Sokol, and S.-Y. Lee, “Beam Measurement by a Wall Gap Monitor in ALPHA”, in Proc. PAC'11, New York, NY, USA, Mar.-Apr. 2011, paper WEP149, pp. 1761-1763.
[n] J. Zhao et al., “The BEPC Control System Upgraded”, in Proc. PAC'95, Dallas, TX, USA, May 1995, paper MPA01, pp. 2193-2195.
[n] Y. K. Batygin, J. S. Kolski, R. C. McCrady, and L. Rybarcyk, “Operation of LANSCE Linear Accelerator with Double Pulse Rate and Low Beam Losses”, in Proc. IPAC'16, Busan, Korea, May 2016, pp. 1004-1006. doi:10.18429/JACoW-IPAC2016-TUOAA01
For LaTeX
Use Complete Form
For BibTeX
References
- R. W. Garnett et al., “Status of the LANSCE Front-End Upgrade”, in Proc. North American Particle Accelerator Conf. (NAPAC'13), Pasadena, CA, USA, Sep.-Oct. 2013, paper MOPMA14, pp. 327-329.
- S. A. Watson, G. R. Jennings, and D. C. Moir, “RF Phase Measurement at Phermex Using Time-To-Digital Converters”, in Proc. 13th Particle Accelerator Conf. (PAC'89), Chicago, IL, USA, Mar. 1989, pp. 1591-1593.
- J. S. Kolski, “Proposed Varying Amplitude Raster Pattern to Uniformly Cover Target for the Isotope Production Facility (IPF) at LANSCE”, in Proc. 54th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'14), East Lansing, MI, USA, Nov. 2014, paper MOPAB46, pp. 148-150.
- R. W. Garnett, S. S. Kurennoy, J. F. O, L. Rybarcyk, and A. Schempp, “Progress towards an RFQ-based Front End for LANSCE”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper WEPS068, pp. 2658-2660.
- R. W. Garnett et al., “LANSCE H+ RFQ Status”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 4073-4075.
- T. H. Luo, P. D. McChesney, P. E. Sokol, and S.-Y. Lee, “Beam Measurement by a Wall Gap Monitor in ALPHA”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper WEP149, pp. 1761-1763.
- J. Zhao et al., “The BEPC Control System Upgraded”, in Proc. 16th Particle Accelerator Conf. (PAC'95), Dallas, TX, USA, May 1995, paper MPA01, pp. 2193-2195.
- Y. K. Batygin, J. S. Kolski, R. C. McCrady, and L. Rybarcyk, “Operation of LANSCE Linear Accelerator with Double Pulse Rate and Low Beam Losses”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 1004-1006.
Back to search