[n] H. J. Choi et al., “Operation Status of HLS System Installed to Measure Ground Change of Large Scientific Equipment in Real Time”, in Proc. 10th Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation Conf. (MEDSI'18), Paris, France, Jun. 2018, pp. 245-248. doi:10.18429/JACoW-MEDSI2018-WEPH18
Use Abbreviated Form
Paper Title: Operation Status of HLS System Installed to Measure Ground Change of Large Scientific Equipment in Real Time
Paper URL: https://jacow.org/medsi2018/papers/WEPH18.pdf
Conference: 10th Mechanical Engineering Design of Synchrotron Radiation Equipment and Instrumentation Conf. (MEDSI'18)
Paper ID: WEPH18
Location in proceedings: 245-248
Original Author String: H. J. Choi, J.H. Han, H.-S. Kang, S.H. Kim, S.N. Kim, H.-G. Lee, S.B. Lee [PAL, Pohang, Kyungbuk, Republic of Korea]