Favourites
For Word
[n] S. Wunderlich and C. Peschke, “Suspended Ground Microstrip Coupled Slotline Electrode for Stochastic Cooling”, in Proc. COOL'21, Novosibirsk, Russia, Nov. 2021, paper P2002, pp. 89-91.
[n] G. Kube et al., “Upgrade of the BPM Long Term Drift Stabilization Scheme Based on External Crossbar Switching at PETRA III”, in Proc. IBIC'22, Kraków, Poland, Sep. 2022, pp. 395-398. doi:10.18429/JACoW-IBIC2022-WEP08
[n] P. Leban et al., “Preliminary Evaluation of the MTCA.4 BPM Electronics Prototype for the PETRA IV Project”, in Proc. IBIC'22, Kraków, Poland, Sep. 2022, pp. 399-402. doi:10.18429/JACoW-IBIC2022-WEP09
[n] F. J. Sacherer and T. R. Sherwood, “The Effect of Space Charge in Beam Transport Lines”, in Proc. PAC'71, Chicago, IL, USA, Mar. 1971, pp. 1066-1068.
[n] K. B. Scheidt, F. Ewald, and P. Leban, “Optimized Beam Loss Monitor System for the ESRF”, in Proc. IBIC'16, Barcelona, Spain, Sep. 2016, pp. 86-89. doi:10.18429/JACoW-IBIC2016-MOPG20
[n] Y. P. Sun and M. Borland, “Comparison of Nonlinear Dynamics Optimization Methods for APS-U”, in Proc. NAPAC'16, Chicago, IL, USA, Oct. 2016, pp. 924-927. doi:10.18429/JACoW-NAPAC2016-WEPOB15
[n] I. Sakai et al., “H- Painting Injection System for the J-PARC 3GeV High Intensity Proton Synchrotron”, in Proc. PAC'03, Portland, OR, USA, May 2003, paper TPAG037, pp. 1512-1514.
[n] P. Leban et al., “New RF BPM Electronics for the 560 Beam Position Monitors of the APS-U Storage Ring”, in Proc. IPAC'21, Campinas, Brazil, May 2021, pp. 4325-4328. doi:10.18429/JACoW-IPAC2021-THPAB265
For LaTeX
Use Complete Form
For BibTeX
References
- S. Wunderlich and C. Peschke, “Suspended Ground Microstrip Coupled Slotline Electrode for Stochastic Cooling”, in Proc. 13th Workshop on Beam Cooling and Related Topics (COOL'21), Novosibirsk, Russia, Nov. 2021, paper P2002, pp. 89-91.
- G. Kube et al., “Upgrade of the BPM Long Term Drift Stabilization Scheme Based on External Crossbar Switching at PETRA III”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 395-398.
- P. Leban et al., “Preliminary Evaluation of the MTCA.4 BPM Electronics Prototype for the PETRA IV Project”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 399-402.
- F. J. Sacherer and T. R. Sherwood, “The Effect of Space Charge in Beam Transport Lines”, in Proc. 4th Particle Accelerator Conf. (PAC'71), Chicago, IL, USA, Mar. 1971, pp. 1066-1068.
- K. B. Scheidt, F. Ewald, and P. Leban, “Optimized Beam Loss Monitor System for the ESRF”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 86-89.
- Y. P. Sun and M. Borland, “Comparison of Nonlinear Dynamics Optimization Methods for APS-U”, in Proc. North American Particle Accelerator Conf. (NAPAC'16), Chicago, IL, USA, Oct. 2016, pp. 924-927.
- I. Sakai et al., “H- Painting Injection System for the J-PARC 3GeV High Intensity Proton Synchrotron”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper TPAG037, pp. 1512-1514.
- P. Leban et al., “New RF BPM Electronics for the 560 Beam Position Monitors of the APS-U Storage Ring”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 4325-4328.
Back to search