JaCoW Logo

Reference Search

Favourites


For Word

[n]	N. Chanlek, J. D. Herbert, L. B. Jones, R. M. Jones, K. J. Middleman, and B. L. Militsyn, “Gallium Arsenide Preparation and QE Lifetime Studies using the ALICE Photocathode Preparation Facility”, in Proc. IPAC'10, Kyoto, Japan, May 2010, paper TUPEC018, pp. 1752-1754. 
[n]	T. Watanabe, N. Fukunishi, M. Kase, Y. Sasaki, and Y. Yano, “Development of Beam Current Monitor with HTS SQUID and HTS Current Sensor”, in Proc. HIAT'09, Venice, Italy, Jun. 2009, paper WE-05, pp. 109-113. 
[n]	S. Pordes, J. L. Crisp, B. J. Fellenz, R. H. Flora, A. Para, and A. V. Tollestrup, “Signal Processing for Longitudinal Parameters of the Tevatron Beam”, in Proc. PAC'05, Knoxville, TN, USA, May 2005, paper RPAT013, pp. 1362-1364. 
[n]	A. Harvey, “Mineral-Insulated Conductors for Magnet Coils”, in Proc. LINAC'70, Batavia, IL, USA, Sep.-Oct. 1970, paper G-6, pp. 707-718. 
[n]	M. J. Lamm et al., “Fabrication and Test Challenges of the SC Transport Solenoid for Mu2e Experiment”, presented at the IPAC'21, Campinas, Brazil, May 2021, paper TUXC01, unpublished. 
[n]	X. S. Geng, L. Ma, P. Shi, and K. R. Ye, “Beam Position Monitoring System for the BEPC Storage Ring”, in Proc. EPAC'96, Sitges, Spain, Jun. 1996, paper TUP001L, pp. 1567-1569. 
[n]	V. V. Kushin et al., “First Experience of Works with Compact Injectors for Trials and Drills of RF Linac Structures”, in Proc. LINAC'98, Chicago, IL, USA, Aug. 1998, paper MO4052, pp. 168-170. 
[n]	K. Kittimanapun, N. Chanlek, A. Lakrathok, and N. Laoiamnongwong, “Low Intensity Electron Beam Measurement at SLRI Beam Test Facility”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 4502-4504. doi:10.18429/JACoW-IPAC2018-THPMK086
[n]	P. Bowe, S. P. M?©ller, J. S. Nielsen, and U. V. Pedersen, “Intensity Limitations of the Electrostatic Storage Ring ELISA”, in Proc. EPAC'00, Vienna, Austria, Jun. 2000, paper MOP1B03, pp. 788-790. 
[n]	O. K. Mulvany, B. Billett, B. Brajuskovic, J. A. Carter, A. McElderry, and K. J. Wakefield, “NEG-Coated Copper Vacuum Chambers for the APS-Upgrade Storage Ring Vacuum System”, in Proc. NAPAC'19, Lansing, MI, USA, Sep. 2019, pp. 477-479. doi:10.18429/JACoW-NAPAC2019-TUPLS11

For LaTeX

Use Complete Form

For BibTeX

References

Back to search