Favourites
For Word
[n] J. L. Menke, “Beam Monitoring at the NBS Linac - Energy, Positioning, Current, Charge”, in Proc. PAC'69, Washington D.C., USA, Mar. 1969, pp. 921-923.
[n] R. E. Laxdal et al., “The Injector Cryomodule for e-Linac at TRIUMF”, in Proc. PAC'11, New York, NY, USA, Mar.-Apr. 2011, paper WEOCS6, pp. 1469-1471.
[n] T. Xue, G. H. Gong, H. Li, and J. M. Li, “Design of EPICS IOC Based on RAIN1000Z1 ZYNQ Module”, in Proc. ICALEPCS'15, Melbourne, Australia, Oct. 2015, pp. 905-906. doi:10.18429/JACoW-ICALEPCS2015-WEPGF090
[n] H. Li, G. H. Gong, and Q. Du, “Prototype of White Rabbit Network in LHAASO”, in Proc. ICALEPCS'15, Melbourne, Australia, Oct. 2015, pp. 999-1002. doi:10.18429/JACoW-ICALEPCS2015-WEPGF126
[n] D. Wang, K. L. F. Bane, S. De Santis, D. Li, T. H. Luo, and M. Venturini, “The Broad-Band Impedance Budget of the Accumulator Ring in the ALS-U Project”, in Proc. NAPAC'19, Lansing, MI, USA, Sep. 2019, pp. 74-77. doi:10.18429/JACoW-NAPAC2019-MOZBA6
[n] A. Miura, Y. Kawane, N. Ouchi, and T. Miyao, “Vacuum Improvement of Bunch Shape Monitor for J-PARC Linac”, in Proc. IBIC'14, Monterey, CA, USA, Sep. 2014, paper TUPD09, pp. 430-434.
For LaTeX
Use Complete Form
For BibTeX
References
- J. L. Menke, “Beam Monitoring at the NBS Linac - Energy, Positioning, Current, Charge”, in Proc. 3rd Particle Accelerator Conf. (PAC'69), Washington D.C., USA, Mar. 1969, pp. 921-923.
- R. E. Laxdal et al., “The Injector Cryomodule for e-Linac at TRIUMF”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper WEOCS6, pp. 1469-1471.
- T. Xue, G. H. Gong, H. Li, and J. M. Li, “Design of EPICS IOC Based on RAIN1000Z1 ZYNQ Module”, in Proc. 15th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'15), Melbourne, Australia, Oct. 2015, pp. 905-906.
- H. Li, G. H. Gong, and Q. Du, “Prototype of White Rabbit Network in LHAASO”, in Proc. 15th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'15), Melbourne, Australia, Oct. 2015, pp. 999-1002.
- D. Wang, K. L. F. Bane, S. De Santis, D. Li, T. H. Luo, and M. Venturini, “The Broad-Band Impedance Budget of the Accumulator Ring in the ALS-U Project”, in Proc. North American Particle Accelerator Conf. (NAPAC'19), Lansing, MI, USA, Sep. 2019, pp. 74-77.
- A. Miura, Y. Kawane, N. Ouchi, and T. Miyao, “Vacuum Improvement of Bunch Shape Monitor for J-PARC Linac”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper TUPD09, pp. 430-434.
Back to search