Favourites
For Word
[n] O. Kamigaito et al., “Present Status and Future Plan of RIKEN RI Beam Factory”, in Proc. IPAC'16, Busan, Korea, May 2016, pp. 1281-1283. doi:10.18429/JACoW-IPAC2016-TUPMR022
[n] Y. Hu and L. R. Dalesio, “Diagnosing and Controls of NSLS-II: A Bright New Light for Science”, in Proc. ICAP'15, Shanghai, China, Oct. 2015, pp. 84-86. doi:10.18429/JACoW-ICAP2015-WEP11
[n] G. Shen, M. A. Davidsaver, and M. R. Kraimer, “EPICS V4 in Python”, in Proc. ICALEPCS'11, Grenoble, France, Oct. 2011, paper WEPKS021, pp. 830-832.
[n] P. Pierini, S. Barbanotti, L. Monaco, and N. Panzeri, “Design of a Magnetic Shield Internal to the Helium Vessel of SRF Cavities”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper MOPP148, pp. 898-900.
[n] D. Malyutin et al., “Commissioning of New Diagnostic Devices at PITZ”, in Proc. RuPAC'12, Saint Petersburg, Russia, Sep. 2012, paper WEPPD057, pp. 674-676.
[n] L. P. Bellier, J. N. Jacquemier, L. Soby, and S. Deghaye, “CTF3 Beam Position Monitor Acquisition System”, in Proc. ICALEPCS'07, Oak Ridge, TN, USA, Oct. 2007, paper WPPB01, pp. 395-397.
[n] S. Balachandran et al., “Microstructure Development in a Cold Worked SRF Niobium Sheet After Heat Treatments”, in Proc. SRF'23, Grand Rapids, MI, USA, Jun. 2023, paper MOPMB041, pp. 191-196.
For LaTeX
Use Complete Form
For BibTeX
References
- O. Kamigaito et al., “Present Status and Future Plan of RIKEN RI Beam Factory”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 1281-1283.
- Y. Hu and L. R. Dalesio, “Diagnosing and Controls of NSLS-II: A Bright New Light for Science”, in Proc. 12th Int. Computational Accelerator Physics Conf. (ICAP'15), Shanghai, China, Oct. 2015, pp. 84-86.
- G. Shen, M. A. Davidsaver, and M. R. Kraimer, “EPICS V4 in Python”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper WEPKS021, pp. 830-832.
- P. Pierini, S. Barbanotti, L. Monaco, and N. Panzeri, “Design of a Magnetic Shield Internal to the Helium Vessel of SRF Cavities”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPP148, pp. 898-900.
- D. Malyutin et al., “Commissioning of New Diagnostic Devices at PITZ”, in Proc. 23rd Russian Particle Accelerator Conf. (RuPAC'12), Saint Petersburg, Russia, Sep. 2012, paper WEPPD057, pp. 674-676.
- L. P. Bellier, J. N. Jacquemier, L. Soby, and S. Deghaye, “CTF3 Beam Position Monitor Acquisition System”, in Proc. 11th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'07), Oak Ridge, TN, USA, Oct. 2007, paper WPPB01, pp. 395-397.
- S. Balachandran et al., “Microstructure Development in a Cold Worked SRF Niobium Sheet After Heat Treatments”, presented at the 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOPMB041, unpublished.
Back to search