[n] C. B. Bracco, R. W. Assmann, S. Redaelli, and G. Robert-Demolaize, “Scenarios for Beam Commissioning of the LHC Collimation System”, in Proc. PAC'07, Albuquerque, NM, USA, Jun. 2007, paper TUPAN087, pp. 1577-1579.
[n] S. Wagner, A. Apollonio, R. Schmidt, M. Zerlauth, and A. Vergara-Fernandez, “Architecture for Interlock Systems: Reliability Analysis with Regard to Safety and Availability”, in Proc. ICALEPCS'11, Grenoble, France, Oct. 2011, paper WEPMU006, pp. 1058-1061.
Use Complete Form