JaCoW Logo

Reference Search

Favourites


For Word

[n]	W. M. Sharp, J. J. Barnard, and S. S. Yu, “Transport and Error Sensitivity in a Heavy-Ion Recirculator”, in Proc. PAC'91, San Francisco, CA, USA, May 1991, pp. 260-263. 
[n]	S. F. Buffechoux et al., “Recent Results on Acceleration Mechanisms and Beam Optimization of Laser-Driven Proton Beams”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper TH4GBC01, pp. 3148-3150. 
[n]	S. C. Schaller et al., “Completion of the LANSCE Proton Storage Ring Control System Upgrade - A Successful Integration of EPICS into a Running Control System”, in Proc. PAC'97, Vancouver, Canada, May 1997, paper 3P045, pp. 2464-2466. 
[n]	H. W. Schreuder, “Invited Paper: The AGOR Cyclotron Past the Half-Way Mark”, in Proc. Cyclotrons'89, Berlin, Germany, May 1989, paper B-01, pp. 21-25. 
[n]	S. V. Kuzikov, S. P. Antipov, P. V. Avrakhov, E. W. Knight, J. G. Power, and Y. Zhao, “Diamond Beam Halo Monitor”, in Proc. IBIC'20, Santos, Brazil, Sep. 2020, pp. 197-201. doi:10.18429/JACoW-IBIC2020-WEPP38
[n]	D. Perini et al., “The Development Programme of Cathodes and Electron Guns for the Hollow Electron Lenses of the High Luminosity LHC Project”, in Proc. IPAC'19, Melbourne, Australia, May 2019, pp. 1102-1105. doi:10.18429/JACoW-IPAC2019-MOPTS099
[n]	A. Browman, L. N. Hand, G. Rouse, and T. Tso, “A Slow Extracted Beam for the Cornell 2 Ge V Synchrotron”, in Proc. PAC'69, Washington D.C., USA, Mar. 1969, pp. 260-262. 
[n]	F. Geslin, M. Chabot, J. Lesrel, D. Reynet, Ch. L. Lievin, and S. Sierra, “Development of 352.2 Mhz Power Coupler Window for R&D Purposes”, in Proc. LINAC'16, East Lansing, MI, USA, Sep. 2016, pp. 779-781. doi:10.18429/JACoW-LINAC2016-THPRC007
[n]	S. Igarashi et al., “Observation of Emittance Growth at the injection in the KEK PS Main Ring”, in Proc. HB'06, Tsukuba, Japan, May-Jun. 2006, paper WEBX02, pp. 250-252. 
[n]	E. Jones, “The CERN ppBar Facility”, in Proc. EPAC'88, Rome, Italy, Jun. 1988, pp. 215-218. 
[n]	C. Swain, C. Welsch, J. Wolfenden, and L. Eley, “Design of a non-invasive bunch length monitor using coherent synchrotron radiation simulations”, in Proc. IPAC'24, Nashville, TN, USA, May 2024, pp. 2222-2224. doi:10.18429/JACoW-IPAC2024-WEPG17
[n]	R. M. Stringfield et al., “Large Orbit Gyroklystron Development at Los Alamos”, in Proc. LINAC'92, Ottawa, Canada, Aug. 1992, paper MO4-52, pp. 190-192. 

For LaTeX

Use Complete Form

For BibTeX

References

Back to search