Favourites
For Word
[n] J. Mun et al., “Performance Analysis of Variable-Period Helical Undulator with Permanent Magnet for a KAERI THz FEL”, in Proc. FEL'14, Basel, Switzerland, Aug. 2014, paper MOP030, pp. 84-86.
[n] F. P?®rez et al., “High Power Cavity Combiner for RF Amplifiers”, in Proc. EPAC'06, Edinburgh, UK, Jun. 2006, paper THPCH179, pp. 3215-3217.
[n] A. A. Nosych et al., “Measurements and Calibration of the Stripline BPM for the ELI-NP facility with the Stretched Wire Method”, in Proc. IBIC'15, Melbourne, Australia, Sep. 2015, pp. 423-427. doi:10.18429/JACoW-IBIC2015-TUPB048
[n] A. Olmos et al., “Integration of the Diamond Transverse Multibunch Feedback System at ALBA”, in Proc. IBIC'15, Melbourne, Australia, Sep. 2015, pp. 414-417. doi:10.18429/JACoW-IBIC2015-TUPB046
[n] U. Iriso, M. Alvarez, F. F. B. Fernandez, A. Olmos, and F. Perez, “Diagnostics during the ALBA Storage Ring Commissioning”, in Proc. DIPAC'11, Hamburg, Germany, May 2011, paper TUOA02, pp. 280-282.
[n] G. LeBlanc et al., “Status of the MAX-lab Injector Project”, in Proc. PAC'01, Chicago, IL, USA, Jun. 2001, paper WPAH080, pp. 2278-2280.
[n] M. Stirbet et al., “Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source”, in Proc. PAC'01, Chicago, IL, USA, Jun. 2001, paper MPPH148, pp. 1125-1127.
[n] V. Volkov et al., “CW 100 keV Electron RF Injector for 40 mA Average Beam Current”, in Proc. RuPAC'14, Obninsk, Russia, Oct. 2014, paper THCE02, pp. 309-311.
For LaTeX
Use Complete Form
For BibTeX
References
- J. Mun et al., “Performance Analysis of Variable-Period Helical Undulator with Permanent Magnet for a KAERI THz FEL”, in Proc. 36th Int. Free Electron Laser Conf. (FEL'14), Basel, Switzerland, Aug. 2014, paper MOP030, pp. 84-86.
- F. P?®rez et al., “High Power Cavity Combiner for RF Amplifiers”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper THPCH179, pp. 3215-3217.
- A. A. Nosych et al., “Measurements and Calibration of the Stripline BPM for the ELI-NP facility with the Stretched Wire Method”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 423-427.
- A. Olmos et al., “Integration of the Diamond Transverse Multibunch Feedback System at ALBA”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 414-417.
- U. Iriso, M. Alvarez, F. F. B. Fernandez, A. Olmos, and F. Perez, “Diagnostics during the ALBA Storage Ring Commissioning”, in Proc. 10th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC'11), Hamburg, Germany, May 2011, paper TUOA02, pp. 280-282.
- G. LeBlanc et al., “Status of the MAX-lab Injector Project”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper WPAH080, pp. 2278-2280.
- M. Stirbet et al., “Testing Procedures and Results of the Prototype Fundamental Power Coupler for the Spallation Neutron Source”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper MPPH148, pp. 1125-1127.
- V. Volkov et al., “CW 100 keV Electron RF Injector for 40 mA Average Beam Current”, in Proc. 24th Russian Particle Accelerator Conf. (RuPAC'14), Obninsk, Russia, Oct. 2014, paper THCE02, pp. 309-311.
Back to search