Favourites
For Word
[n] J. D. Sedillo, D. Martinez, and J. D. Nguyen, “LANSCE 1L Harp Data Acquisition System Upgrade: First Results”, in Proc. IBIC'15, Melbourne, Australia, Sep. 2015, pp. 542-546. doi:10.18429/JACoW-IBIC2015-TUPB081
[n] M.-B. Chen, W.-B. Sen, S.-L. Xu, and Z.-J. Yao, “Orbit Programming and its Excellent Results During the Commissioning of the INR Cyclotron”, in Proc. Cyclotrons'84, East Lansing, MI, USA, Apr.-May 1984, paper J03, pp. 347-350.
[n] L. T. Stant et al., “Diamond-II Electron Beam Position Monitor Development”, in Proc. IBIC'22, Kraków, Poland, Sep. 2022, pp. 168-172. doi:10.18429/JACoW-IBIC2022-MO3C2
[n] J. Y. Liu, H. B. Chen, A. Grudiev, J. Shi, and H. Zha, “Wakefield Suppression in the Main LINAC of the Klystron-Based First Stage of CLIC at 380 GeV”, in Proc. IPAC'19, Melbourne, Australia, May 2019, pp. 2899-2902. doi:10.18429/JACoW-IPAC2019-WEPRB043
[n] A. F. D. Morgan, “Technological Review of Beam Position Button Design and Manufacture”, in Proc. IBIC'19, Malmö, Sweden, Sep. 2019, pp. 448-452. doi:10.18429/JACoW-IBIC2019-WEAO01
[n] E. Kako et al., “Cryomodule Tests of Four Tesla-Like Cavities in the STF Phass-1.0 for ILC”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper TU3RAI04, pp. 709-713.
[n] C. P. Welsch, “Research Results from the DITANET Project”, in Proc. BIW'12, Newport News, VA, USA, Apr. 2012, paper TUPG015, pp. 164-166.
[n] C. Krantz et al., “Electron Cooling of Low-Energy Ion Beams in CRYRING@ESR”, presented at the COOL2023, Montreux, Switzerland, Oct. 2023, paper FRPAM1R1, unpublished.
[n] J. Branlard et al., “RF Operation Experience at the European XFEL”, in Proc. LINAC'18, Beijing, China, Sep. 2018, pp. 109-111. doi:10.18429/JACoW-LINAC2018-MOPO038
For LaTeX
Use Complete Form
For BibTeX
References
- J. D. Sedillo, D. Martinez, and J. D. Nguyen, “LANSCE 1L Harp Data Acquisition System Upgrade: First Results”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 542-546.
- M.-B. Chen, W.-B. Sen, S.-L. Xu, and Z.-J. Yao, “Orbit Programming and its Excellent Results During the Commissioning of the INR Cyclotron”, in Proc. 10th Int. Cyclotron Conf. and Their Applications (Cyclotrons'84), East Lansing, MI, USA, Apr.-May 1984, paper J03, pp. 347-350.
- L. T. Stant et al., “Diamond-II Electron Beam Position Monitor Development”, in Proc. 11th Int. Beam Instrumentation Conference (IBIC'22), Kraków, Poland, Sep. 2022, pp. 168-172.
- J. Y. Liu, H. B. Chen, A. Grudiev, J. Shi, and H. Zha, “Wakefield Suppression in the Main LINAC of the Klystron-Based First Stage of CLIC at 380 GeV”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 2899-2902.
- A. F. D. Morgan, “Technological Review of Beam Position Button Design and Manufacture”, in Proc. 8th Int. Beam Instrumentation Conf. (IBIC'19), Malmö, Sweden, Sep. 2019, pp. 448-452.
- E. Kako et al., “Cryomodule Tests of Four Tesla-Like Cavities in the STF Phass-1.0 for ILC”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper TU3RAI04, pp. 709-713.
- C. P. Welsch, “Research Results from the DITANET Project”, in Proc. 15th Beam Instrumentation Workshop (BIW'12), Newport News, VA, USA, Apr. 2012, paper TUPG015, pp. 164-166.
- C. Krantz et al., “Electron Cooling of Low-Energy Ion Beams in CRYRING@ESR”, presented at the 14th International Workshop on Beam Cooling and Related Topics (COOL2023), Montreux, Switzerland, Oct. 2023, paper FRPAM1R1, unpublished.
- J. Branlard et al., “RF Operation Experience at the European XFEL”, in Proc. 29th Linear Accelerator Conf. (LINAC'18), Beijing, China, Sep. 2018, pp. 109-111.
Back to search