Favourites
For Word
[n] P. Thongjerm, A. Ngamlamiad, W. Pornroongruengchok, K. Tangpong, and S. Wonglee, “Development of a Cyclotron Based External Beam Irradiation System for Elemental Analysis”, in Proc. IPAC'22, Bangkok, Thailand, Jun. 2022, pp. 3064-3066. doi:10.18429/JACoW-IPAC2022-THPOMS042
[n] A. Drago et al., “High Current Multibunch Operation at DAɸNE”, in Proc. PAC'01, Chicago, IL, USA, Jun. 2001, paper RPPH130, pp. 3543-3545.
[n] C. Biscari, “Future Plans for e+e- Factories”, in Proc. PAC'03, Portland, OR, USA, May 2003, paper WOAA001, pp. 335-339.
[n] G. V. Trubnikov et al., “Project of the Nuclotron-based Ion Collider Facility (NICA) at JINR”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper WEPP029, pp. 2581-2583.
[n] L. Lari, H. Gaillard, and V. Mertens, “Scheduling the Installation of the LHC Injection Lines”, in Proc. EPAC'04, Lucerne, Switzerland, Jul. 2004, paper WEPLT024, pp. 1879-1881.
[n] R. Mu??oz Horta, D. Lanaia, E. Mar?¡n, A. Olmos, and F. P?®rez, “Linac Energy Jitter Measurements with SPARK BPMs at ALBA”, in Proc. IPAC'19, Melbourne, Australia, May 2019, pp. 833-836. doi:10.18429/JACoW-IPAC2019-MOPTS002
[n] M. A. Fraser, J. C. Broere, S. Haastrup, D. Lanaia, D. Valuch, and D. Voulot, “Understanding the Error Tolerances Required to Automatically Phase the HIE-ISOLDE Linac”, in Proc. LINAC'14, Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP031, pp. 496-498.
[n] C. Hernalsteens, S. Damjanovic, S. S. Gilardoni, and M. Giovannozzi, “Numerical Simulations to Evaluate the Performance of CERN PS Dummy Septum to Reduce Irradiation for the Multi-Turn Extraction”, in Proc. IPAC'13, Shanghai, China, May 2013, paper WEPEA057, pp. 2636-2638.
For LaTeX
Use Complete Form
For BibTeX
References
- P. Thongjerm, A. Ngamlamiad, W. Pornroongruengchok, K. Tangpong, and S. Wonglee, “Development of a Cyclotron Based External Beam Irradiation System for Elemental Analysis”, in Proc. 13th Int. Particle Accelerator Conf. (IPAC'22), Bangkok, Thailand, Jun. 2022, pp. 3064-3066.
- A. Drago et al., “High Current Multibunch Operation at DAɸNE”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper RPPH130, pp. 3543-3545.
- C. Biscari, “Future Plans for e+e- Factories”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper WOAA001, pp. 335-339.
- G. V. Trubnikov et al., “Project of the Nuclotron-based Ion Collider Facility (NICA) at JINR”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPP029, pp. 2581-2583.
- L. Lari, H. Gaillard, and V. Mertens, “Scheduling the Installation of the LHC Injection Lines”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper WEPLT024, pp. 1879-1881.
- R. Mu??oz Horta, D. Lanaia, E. Mar?¡n, A. Olmos, and F. P?®rez, “Linac Energy Jitter Measurements with SPARK BPMs at ALBA”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 833-836.
- M. A. Fraser, J. C. Broere, S. Haastrup, D. Lanaia, D. Valuch, and D. Voulot, “Understanding the Error Tolerances Required to Automatically Phase the HIE-ISOLDE Linac”, in Proc. 27th Linear Accelerator Conf. (LINAC'14), Geneva, Switzerland, Aug.-Sep. 2014, paper TUPP031, pp. 496-498.
- C. Hernalsteens, S. Damjanovic, S. S. Gilardoni, and M. Giovannozzi, “Numerical Simulations to Evaluate the Performance of CERN PS Dummy Septum to Reduce Irradiation for the Multi-Turn Extraction”, in Proc. 4th Int. Particle Accelerator Conf. (IPAC'13), Shanghai, China, May 2013, paper WEPEA057, pp. 2636-2638.
Back to search