Favourites
For Word
[n] V. Papadimitriou et al., “Design of the LBNE Beamline”, in Proc. IPAC'14, Dresden, Germany, Jun. 2014, pp. 907-909. doi:10.18429/JACoW-IPAC2014-TUOAA02
[n] C. Gruen, S. Schreiber, and T. Schulz, “A Laser Pulse Controller for the Injector Laser at FLASH and European XFEL”, in Proc. LINAC'16, East Lansing, MI, USA, Sep. 2016, pp. 882-884. doi:10.18429/JACoW-LINAC2016-THPLR019
[n] T. M. Huang et al., “The Fundamental Power Coupler for CEPC Booster Cavity”, in Proc. SRF'19, Dresden, Germany, Jun.-Jul. 2019, pp. 789-794. doi:10.18429/JACoW-SRF2019-WETEB8
[n] R. Rybaniec et al., “Real-time Estimation of Superconducting Cavities Parameters”, in Proc. IPAC'14, Dresden, Germany, Jun. 2014, pp. 2456-2458. doi:10.18429/JACoW-IPAC2014-WEPME075
[n] J. Tiskumara et al., “LLRF commissioning of the CEBAF C75 upgrades SAM 2024/25”, in Proc. NAPAC'25, Sacramento, California, USA, Aug. 2025, pp. 789-792. doi:10.18429/JACoW-NAPAC2025-WEP056
[n] M. Lee et al., “Lattice Commissioning Strategy for the B-Factory”, in Proc. PAC'97, Vancouver, Canada, May 1997, paper 8P093, pp. 2586-2588.
For LaTeX
Use Complete Form
For BibTeX
References
- V. Papadimitriou et al., “Design of the LBNE Beamline”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 907-909.
- C. Gruen, S. Schreiber, and T. Schulz, “A Laser Pulse Controller for the Injector Laser at FLASH and European XFEL”, in Proc. 28th Linear Accelerator Conf. (LINAC'16), East Lansing, MI, USA, Sep. 2016, pp. 882-884.
- T. M. Huang et al., “The Fundamental Power Coupler for CEPC Booster Cavity”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 789-794.
- R. Rybaniec et al., “Real-time Estimation of Superconducting Cavities Parameters”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 2456-2458.
- J. Tiskumara et al., “LLRF commissioning of the CEBAF C75 upgrades SAM 2024/25”, in Proc. 6th North American Particle Accelerator Conference (NAPAC'25), Sacramento, California, USA, Aug. 2025, pp. 789-792.
- M. Lee et al., “Lattice Commissioning Strategy for the B-Factory”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 8P093, pp. 2586-2588.
Back to search