Warning
The page numbers for some of these references could not be added automatically. You must provide the page numbers from the original proceedings which is located at JACoW.org, and substitute ‘pp. XX-XX’ with the correct page numbers.
Favourites
For Word
[n] P. Kuske, M. Abo-Bakr, W. Anders, and G. Wuestefeld, “Bunch Length Measurements at BESSY”, in Proc. PAC'03, Portland, OR, USA, May 2003, paper RPPB005, pp. 3020-3022.
[n] P. O. Schmid, D. B. Engel, J. Feikes, M. Ries, and G. Wuestefeld, “Mitigating the Pertubations Caused by U 180 at the Metrology Light Source”, in Proc. IPAC'11, San Sebastian, Spain, Sep. 2011, paper THPC012, pp. 2930-2932.
[n] P. Kuske and K. Ott, “Beam-Based Alignment at BESSY”, in Proc. EPAC'96, Sitges, Spain, Jun. 1996, paper MOP001L, pp. 887-889.
[n] Y. Yamazaki, “J-PARC Status”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper MO2BCI03, pp. 18-22.
[n] P. Kuske, M. Abo-Bakr, J. Feikes, K. Holldack, and G. Wuestefeld, “Coherent Emission of Synchrotron Radiation and Longitudinal Instabilities”, in Proc. PAC'03, Portland, OR, USA, May 2003, paper RPPB006, pp. 3023-3025.
[n] H. Witte, J. S. Berg, R. B. Palmer, D. Stratakis, and F. Borgnolutti, “Magnet Design for a Six-dimensional Rectilinear Cooling Channel - Feasibility Study”, in Proc. IPAC'14, Dresden, Germany, Jun. 2014, pp. 2740-2742. doi:10.18429/JACoW-IPAC2014-WEPRI103
[n] J. Feikes, K. Holldack, P. Kuske, and R. M??ller, “Beam Stabilization at BESSY: Set-up, Performance, Plans”, in Proc. ICALEPCS'03, Gyeongju, Korea, Oct. 2003, paper TH112, pp. XX-XX.
For LaTeX
Use Complete Form
For BibTeX
References
- P. Kuske, M. Abo-Bakr, W. Anders, and G. Wuestefeld, “Bunch Length Measurements at BESSY”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper RPPB005, pp. 3020-3022.
- P. O. Schmid, D. B. Engel, J. Feikes, M. Ries, and G. Wuestefeld, “Mitigating the Pertubations Caused by U 180 at the Metrology Light Source”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper THPC012, pp. 2930-2932.
- P. Kuske and K. Ott, “Beam-Based Alignment at BESSY”, in Proc. 5th European Particle Accelerator Conf. (EPAC'96), Sitges, Spain, Jun. 1996, paper MOP001L, pp. 887-889.
- Y. Yamazaki, “J-PARC Status”, in Proc. 23rd Particle Accelerator Conf. (PAC'09), Vancouver, Canada, May 2009, paper MO2BCI03, pp. 18-22.
- P. Kuske, M. Abo-Bakr, J. Feikes, K. Holldack, and G. Wuestefeld, “Coherent Emission of Synchrotron Radiation and Longitudinal Instabilities”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper RPPB006, pp. 3023-3025.
- H. Witte, J. S. Berg, R. B. Palmer, D. Stratakis, and F. Borgnolutti, “Magnet Design for a Six-dimensional Rectilinear Cooling Channel - Feasibility Study”, in Proc. 5th Int. Particle Accelerator Conf. (IPAC'14), Dresden, Germany, Jun. 2014, pp. 2740-2742.
- J. Feikes, K. Holldack, P. Kuske, and R. M??ller, “Beam Stabilization at BESSY: Set-up, Performance, Plans”, in Proc. 9th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'03), Gyeongju, Korea, Oct. 2003, paper TH112, pp. XX-XX.
Back to search