Favourites
For Word
[n] J. J. Guo, H. X. Deng, D. Gu, Q. Gu, M. Meng, and Z. Wang, “Heat Load and Radiation Pulse of Corrugated Structure at SHINE Facility”, in Proc. FLS'23, Luzern, Switzerland, Aug.-Sep. 2023, pp. 168-170. doi:10.18429/JACoW-FLS2023-WE4P09
[n] S. M. Liuzzo et al., “HMBA Optics Correction Experience at ESRF”, in Proc. IPAC'21, Campinas, Brazil, May 2021, pp. 1462-1465. doi:10.18429/JACoW-IPAC2021-TUPAB048
[n] G. Pile et al., “Testing and Implementation Progress on the Advanced Photon Source (APS) Linear Accelerator (Linac) High-Power S-band Switching System”, in Proc. LINAC'00, Monterey, CA, USA, Aug. 2000, paper THE07, pp. 983-985.
[n] S. Assadi, J. Johnstone, P. Martin, F. Tecker, and M. J. Yang, “Implementation of Magnetic Measurements, Errors, and their Consequence in an Optimized Fermilab 8-GeV Transfer Line”, in Proc. PAC'99, New York, NY, USA, Mar. 1999, paper TUA8, pp. 1082-1084.
For LaTeX
Use Complete Form
For BibTeX
References
- J. J. Guo, H. X. Deng, D. Gu, Q. Gu, M. Meng, and Z. Wang, “Heat Load and Radiation Pulse of Corrugated Structure at SHINE Facility”, in Proc. 67th ICFA Advanced Beam Dynamics Workshop on Future Light Sources (FLS'23), Luzern, Switzerland, Aug.-Sep. 2023, paper WE4P09, pp. 168-170.
- S. M. Liuzzo et al., “HMBA Optics Correction Experience at ESRF”, in Proc. 12th Int. Particle Accelerator Conf. (IPAC'21), Campinas, Brazil, May 2021, pp. 1462-1465.
- G. Pile et al., “Testing and Implementation Progress on the Advanced Photon Source (APS) Linear Accelerator (Linac) High-Power S-band Switching System”, in Proc. 20th Linear Accelerator Conf. (LINAC'00), Monterey, CA, USA, Aug. 2000, paper THE07, pp. 983-985.
- S. Assadi, J. Johnstone, P. Martin, F. Tecker, and M. J. Yang, “Implementation of Magnetic Measurements, Errors, and their Consequence in an Optimized Fermilab 8-GeV Transfer Line”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper TUA8, pp. 1082-1084.
Back to search