Favourites
For Word
[n] R. Calaga et al., “Small Angle Crab Compensation for LHC IR Upgrade”, in Proc. PAC'07, Albuquerque, NM, USA, Jun. 2007, paper TUPAS089, pp. 1853-1855.
[n] F.-J. Decker et al., “Timing Stability at LCLS”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 4381-4383. doi:10.18429/JACoW-IPAC2018-THPMK043
[n] J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. SRF'19, Dresden, Germany, Jun.-Jul. 2019, pp. 12-20. doi:10.18429/JACoW-SRF2019-MOFAA3
[n] W. R. Rawnsley and R. E. Laxdal, “A Beam Current Monitor for the VECC Accelerator”, in Proc. IBIC'13, Oxford, UK, Sep. 2013, paper MOPF27, pp. 275-278.
For LaTeX
Use Complete Form
For BibTeX
References
- R. Calaga et al., “Small Angle Crab Compensation for LHC IR Upgrade”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPAS089, pp. 1853-1855.
- F.-J. Decker et al., “Timing Stability at LCLS”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 4381-4383.
- J. Wei et al., “The FRIB SC-Linac - Installation and Phased Commissioning”, in Proc. 19th Int. Conf. RF Superconductivity (SRF'19), Dresden, Germany, Jun.-Jul. 2019, pp. 12-20.
- W. R. Rawnsley and R. E. Laxdal, “A Beam Current Monitor for the VECC Accelerator”, in Proc. 2nd Int. Beam Instrumentation Conf. (IBIC'13), Oxford, UK, Sep. 2013, paper MOPF27, pp. 275-278.
Back to search