Favourites
For Word
[n] S. Seletskiy et al., “Source of Microbunching at BNL NSLS Source Development Laboratory”, in Proc. PAC'11, New York, NY, USA, Mar.-Apr. 2011, paper THP107, pp. 2324-2326.
[n] F. Langlois et al., “Distributed Fast Acquisitions System for Multi Detector Experiments”, in Proc. ICALEPCS'11, Grenoble, France, Oct. 2011, paper WEPKN003, pp. 717-719.
[n] E. Plouviez, F. Epaud, J. M. Koch, and K. B. Scheidt, “The New Fast Orbit Correction System of the ESRF Storage Ring”, in Proc. DIPAC'11, Hamburg, Germany, May 2011, paper MOPD74, pp. 215-217.
[n] P. C. Chiu, J. Chen, K. T. Hsu, K. H. Hu, and C. H. Kuo, “Conceptual Design and Performance Estimation of The TPS Fast Orbit Feedback System”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper THPC120, pp. 3263-3265.
[n] I. Vasserman, “Results of the Magnetic Tuning of 2.8 m Long Vertically Polarizing Undulator with the Dynamic Compensation of Magnetic Forces”, in Proc. IPAC'15, Richmond, VA, USA, May 2015, pp. 1809-1812. doi:10.18429/JACoW-IPAC2015-TUPJE073
[n] Ch. Geyer and D. Kraemer, “Injection and Extraction of the BESSY II Booster and Storage Ring”, in Proc. EPAC'94, London, UK, Jun.-Jul. 1994, pp. 2349-2352.
[n] F. Epaud, “ESRF's New Beam Position System for the Storage Ring using Libera Brilliance Devices”, in Proc. ICALEPCS'09, Kobe, Japan, Oct. 2009, paper THP004, pp. 682-684.
[n] P. C. Chiu et al., “Commissioning of BPM System for the TPS Project”, in Proc. IBIC'15, Melbourne, Australia, Sep. 2015, pp. 512-515. doi:10.18429/JACoW-IBIC2015-TUPB068
[n] F. Epaud, J. M. Koch, and E. Plouviez, “Architecture and Control of the Fast Orbit Correction for the ESRF Storage Ring”, in Proc. ICALEPCS'11, Grenoble, France, Oct. 2011, paper MOPKS014, pp. 189-191.
[n] L.-H. Yu, S. Krinsky, O. Singh, and F. J. Willeke, “The Performance of a Fast Closed Orbit Feedback System with Combined Fast and Slow Correctors”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper THPC140, pp. 3315-3317.
[n] G. Bassi, A. Blednykh, and S. Krinsky, “Passive Landau Cavity Effects in the NSLS-II Storage Ring”, in Proc. IPAC'12, New Orleans, LA, USA, May 2012, paper TUPPP042, pp. 1701-1703.
[n] S. Rubio-Manrique, M. Ounsy, S. Pierre-Joseph Zephir, and G. Strangolino, “Validation of a MySQL-based Archiving System for ALBA Synchrotron”, in Proc. ICALEPCS'09, Kobe, Japan, Oct. 2009, paper WEP010, pp. 426-428.
[n] V. B. Reva et al., “Commissioning 2 MeV Cooler in COSY and Novosibirsk”, in Proc. RuPAC'14, Obninsk, Russia, Oct. 2014, paper TUCA01, pp. 14-16.
[n] C. H. Kuo, P. C. Chiu, K. T. Hsu, and K. H. Hu, “Orbit Feedforward and Feedback Applications in the Taiwan Light Source”, in Proc. IBIC'16, Barcelona, Spain, Sep. 2016, pp. 623-625. doi:10.18429/JACoW-IBIC2016-WEPG06
For LaTeX
Use Complete Form
For BibTeX
References
- S. Seletskiy et al., “Source of Microbunching at BNL NSLS Source Development Laboratory”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper THP107, pp. 2324-2326.
- F. Langlois et al., “Distributed Fast Acquisitions System for Multi Detector Experiments”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper WEPKN003, pp. 717-719.
- E. Plouviez, F. Epaud, J. M. Koch, and K. B. Scheidt, “The New Fast Orbit Correction System of the ESRF Storage Ring”, in Proc. 10th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC'11), Hamburg, Germany, May 2011, paper MOPD74, pp. 215-217.
- P. C. Chiu, J. Chen, K. T. Hsu, K. H. Hu, and C. H. Kuo, “Conceptual Design and Performance Estimation of The TPS Fast Orbit Feedback System”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper THPC120, pp. 3263-3265.
- I. Vasserman, “Results of the Magnetic Tuning of 2.8 m Long Vertically Polarizing Undulator with the Dynamic Compensation of Magnetic Forces”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 1809-1812.
- Ch. Geyer and D. Kraemer, “Injection and Extraction of the BESSY II Booster and Storage Ring”, in Proc. 4th European Particle Accelerator Conf. (EPAC'94), London, UK, Jun.-Jul. 1994, pp. 2349-2352.
- F. Epaud, “ESRF's New Beam Position System for the Storage Ring using Libera Brilliance Devices”, in Proc. 12th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'09), Kobe, Japan, Oct. 2009, paper THP004, pp. 682-684.
- P. C. Chiu et al., “Commissioning of BPM System for the TPS Project”, in Proc. 4th Int. Beam Instrumentation Conf. (IBIC'15), Melbourne, Australia, Sep. 2015, pp. 512-515.
- F. Epaud, J. M. Koch, and E. Plouviez, “Architecture and Control of the Fast Orbit Correction for the ESRF Storage Ring”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper MOPKS014, pp. 189-191.
- L.-H. Yu, S. Krinsky, O. Singh, and F. J. Willeke, “The Performance of a Fast Closed Orbit Feedback System with Combined Fast and Slow Correctors”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper THPC140, pp. 3315-3317.
- G. Bassi, A. Blednykh, and S. Krinsky, “Passive Landau Cavity Effects in the NSLS-II Storage Ring”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper TUPPP042, pp. 1701-1703.
- S. Rubio-Manrique, M. Ounsy, S. Pierre-Joseph Zephir, and G. Strangolino, “Validation of a MySQL-based Archiving System for ALBA Synchrotron”, in Proc. 12th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'09), Kobe, Japan, Oct. 2009, paper WEP010, pp. 426-428.
- V. B. Reva et al., “Commissioning 2 MeV Cooler in COSY and Novosibirsk”, in Proc. 24th Russian Particle Accelerator Conf. (RuPAC'14), Obninsk, Russia, Oct. 2014, paper TUCA01, pp. 14-16.
- C. H. Kuo, P. C. Chiu, K. T. Hsu, and K. H. Hu, “Orbit Feedforward and Feedback Applications in the Taiwan Light Source”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 623-625.
Back to search