Favourites
For Word
[n] G. D'Auria et al., “Installation and Commissioning of the 100 MeV Preinjector Linac of the New Elettra Injector”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper WEPC071, pp. 2160-2162.
[n] A. K. Mitra, R. L. Poirier, J. J. Lu, and R. Hohbach, “Stabilizing a Power Amplifier Feeding a High Q Resonant Load”, in Proc. PAC'95, Dallas, TX, USA, May 1995, paper TAQ33, pp. 1602-1604.
[n] G. D'Auria, P. Delgiusto, M. M. Milloch, C. Serpico, and D. Wang, “The Impact of PSK Timing on Energy Stability of e-Beam at FERMI@ELETTRA”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper MOPC008, pp. 82-84.
For LaTeX
Use Complete Form
For BibTeX
References
- G. D'Auria et al., “Installation and Commissioning of the 100 MeV Preinjector Linac of the New Elettra Injector”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper WEPC071, pp. 2160-2162.
- A. K. Mitra, R. L. Poirier, J. J. Lu, and R. Hohbach, “Stabilizing a Power Amplifier Feeding a High Q Resonant Load”, in Proc. 16th Particle Accelerator Conf. (PAC'95), Dallas, TX, USA, May 1995, paper TAQ33, pp. 1602-1604.
- G. D'Auria, P. Delgiusto, M. M. Milloch, C. Serpico, and D. Wang, “The Impact of PSK Timing on Energy Stability of e-Beam at FERMI@ELETTRA”, in Proc. 11th European Particle Accelerator Conf. (EPAC'08), Genoa, Italy, Jun. 2008, paper MOPC008, pp. 82-84.
Back to search