JaCoW Logo

Reference Search

Warning
The page numbers for some of these references could not be added automatically. You must provide the page numbers from the original proceedings which is located at JACoW.org, and substitute ‘pp. XX-XX’ with the correct page numbers.

Favourites


For Word

[n]	N. P. Abreu, W. Fischer, Y. Luo, and G. Robert-Demolaize, “The Effect of Head-on Beam-beam Compensation on the Stochastic Boundaries and Particle Diffusion in RHIC”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper WEPP002, pp. 2521-2523. 
[n]	V. N. Anosov, M. Chihak, Yu. N. Denisov, A. V. Kalmykov, and A. N. Lubenko, “The System of Automatic Beam Phase Measuring and Control for the Isochronous Cyclotron”, in Proc. Cyclotrons'75, Zurich, Switzerland, Aug. 1975, paper H-09, pp. 565-567. 
[n]	S. E. Kopp et al., “Ion Chambers for Monitoring the NuMI Beam at FNAL”, in Proc. EPAC'04, Lucerne, Switzerland, Jul. 2004, paper THPLT129, pp. 2768-2770. 
[n]	F. Lothrop et al., “Physics and Medicine: The Bevatron/Bevalac Experience, 1979-1980”, in Proc. PAC'81, Washington D.C., USA, Mar. 1981, pp. 2823-2826. 
[n]	Y. Hitaka, M. K. Kono, H. Sato, M. J. Shirakata, and Y. M. Yokomichi, “Numerical Methods for the Orbit Control at the KEK 12 GeV PS”, in Proc. EPAC'04, Lucerne, Switzerland, Jul. 2004, paper THPLT073, pp. 2664-2666. 
[n]	N. K. Abrossimov et al., “DESIGN AND EXPERIMENTAL INVESTIGATION OF THE 200-900 MEV PROTON BEAM OBTAINED BY THE MODERATION OF 1000 MEV PROTONS IN THE DEGRADER”, in Proc. RuPAC'04, Dubna, Russia, Oct. 2004, paper THCP04, pp. XX-XX. 
[n]	R. Dawson, K. Erdman, B. Milton, and N. Stevenson, “Operation of the TR30 Industrial" Cyclotron"”, in Proc. PAC'93, Washington D.C., USA, Mar. 1993, pp. 1733-1735. 
[n]	D. H. Beck et al., “The New White Rabbit Based Timing System for the FAIR Facility”, in Proc. PCaPAC'12, Kolkata, India, Dec. 2012, paper FRIA01, pp. 242-244. 
[n]	R. Boni et al., “Design of the e+/e- Fracscati Linear Accelerator for DaPhine”, in Proc. PAC'93, Washington D.C., USA, Mar. 1993, pp. 611-614. 
[n]	T. Larrieu, Y. Roblin, K. White, and R. Slominski, “Evaluating the Potential of Commercial GIS for Accelerator Configuration Management”, in Proc. ICALEPCS'05, Geneva, Switzerland, Oct. 2005, paper I4_002. 
[n]	I. Alexander, K. Aulenbacher, V. Bechthold, B. Ledroit, and C. Matejcek, “Diagnostic Test-Beam-Line for the MESA Injector”, in Proc. ERL'15, Stony Brook, NY, USA, Jun. 2015, pp. 91-96. doi:10.18429/JACoW-ERL2015-THIALH2069
[n]	J. C. Cornell, “Proposal for a Beam Swinger”, in Proc. Cyclotrons'86, Tokyo, Japan, Oct. 1986, paper I7-09, pp. 552-554. 
[n]	N. A. Stilin et al., “Design of a 1.3 GHz High-Power RF Coupler for Conduction-Cooled Systems”, in Proc. SRF'23, Grand Rapids, MI, USA, Jun. 2023, pp. 342-346. doi:10.18429/JACoW-SRF2023-MOPMB094
[n]	O. A. Anderson and L. L. LoDestro, “Analytic Solution of the Envelope Equations for an Undepressed Matched Beam in a Quadrupole Doublet Channel”, in Proc. PAC'09, Vancouver, Canada, May 2009, paper FR5PFP007, pp. 4320-4322. 
[n]	N. A. Stilin et al., “Conduction-Cooled SRF Cavities: Opportunities and Challenges”, in Proc. SRF'23, Grand Rapids, MI, USA, Jun. 2023, pp. 973-977. doi:10.18429/JACoW-SRF2023-THIXA05
[n]	G. D'Auria, P. Delgiusto, M. M. Milloch, C. Serpico, and D. Wang, “The Impact of PSK Timing on Energy Stability of e-Beam at FERMI@ELETTRA”, in Proc. EPAC'08, Genoa, Italy, Jun. 2008, paper MOPC008, pp. 82-84. 
[n]	K.-H. Hsu, C.-K. Kuan, C.-S. Huang, H. Ho, and W.-Y. Lai, “Assembly process and inspection results for W100”, in Proc. IPAC'24, Nashville, TN, USA, May 2024, pp. 3788-3790. doi:10.18429/JACoW-IPAC2024-THPS24

For LaTeX

Use Complete Form

For BibTeX

References

Back to search