Favourites
For Word
[n] A. Schwinn et al., “FESA3 ÔÇô The New Front-End Software Framework at CERN and the FAIR Facility”, in Proc. PCaPAC'10, Saskatoon, Canada, Oct. 2010, paper WECOAA03, pp. 22-26.
[n] J. Welch, G. Codner, G. Dugan, A. Temnykh, A. Jain, and J. Muratore, “Tests and Measurements of the CESR Phase III Interaction Region Superconducting Magnets”, in Proc. PAC'01, Chicago, IL, USA, Jun. 2001, paper RPPH101, pp. 3472-3474.
[n] J. Y. Jung, S. Marks, and R. Schlueter, “Testing and Commissioning of the ALS Adjustable, Hysteresis-Free Chicane Magnet”, in Proc. PAC'03, Portland, OR, USA, May 2003, paper FPAB084, pp. 3458-3460.
[n] A. I. Muminov, M. F. Vorogushin and D. V. Efremov, “Parameters, Present State and Application Perspectives of the U-250 Cyclotron”, in Proc. Cyclotrons'92, Vancouver, Canada, Jul. 1992, paper I-08, pp. 50-53.
[n] J.-L. Vay et al., “New simulation capabilities of electron clouds in ion beams with large tune depression”, in Proc. HB'06, Tsukuba, Japan, May-Jun. 2006, paper THAW01, pp. 279-282.
[n] A. Chanc?® et al., “Development of an Injector and a Magnetic Transfer Line in the Framework of Cilex”, in Proc. IPAC'16, Busan, Korea, May 2016, pp. 2545-2547. doi:10.18429/JACoW-IPAC2016-WEPMY004
[n] A. Rai et al., “Operational Experience with the IUAC Linac”, in Proc. SRF'09, Berlin, Germany, Sep. 2009, paper TUPPO025, pp. 244-248.
[n] O. Matilla et al., “ALBA Timing System - A Known Architecture with Fast Interlock System Upgrade”, in Proc. ICALEPCS'11, Grenoble, France, Oct. 2011, paper WEPMS023, pp. 1024-1027.
[n] S. Kumar and A. Mandal, “Transverse Emittance Measurement for Low Energy Ion Beams Using Quadrupole Scan Method”, in Proc. IPAC'15, Richmond, VA, USA, May 2015, pp. 226-228. doi:10.18429/JACoW-IPAC2015-MOPWA048
[n] H. Tamura et al., “Further Study on a New Type of a Tuning-Free Cavity with an All-Pass Network”, in Proc. APAC'98, Tsukuba, Japan, Mar. 1998, paper 5D016, pp. 420-422.
[n] J. J. Jamroz et al., “ALBA High Voltage Splitter - Power Distribution to Ion Pumps”, in Proc. ICALEPCS'11, Grenoble, France, Oct. 2011, paper WEPMS024, pp. 1028-1031.
[n] P. Shrivastava, P. Mohania, J. Mulchandani, and Y. W. Wahnmode, “Performance of 6 MW Peak, 25kW Average Power Microwave System for 10 MeV, 10 kW Electron LINAC”, in Proc. APAC'07, Indore, India, Jan.-Feb. 2007, paper THPMA015, pp. 649-651.
[n] T. Schenkel, W. G. Greenway, S. M. Lidia, K. Murphy, W. L. Waldron, and C. D. Weis, “Commissioning and Initial Experiments on NDCX-II”, in Proc. NAPAC'13, Pasadena, CA, USA, Sep.-Oct. 2013, paper MOPAC19, pp. 108-110.
[n] M. Allen et al., “Commissioning of the PEP-II High Power RF Systems”, in Proc. EPAC'98, Stockholm, Sweden, Jun. 1998, paper TUP19F, pp. 1805-1807.
[n] G. V. Dolbilov et al., “Project of SILUND-21 Linear Induction Accelerator for Generation of CLIC Driving Beam (Oral Poster)”, in Proc. LINAC'94, Tsukuba, Japan, Aug. 1994, paper TU-01, pp. 357-359.
[n] H. Blosser et al., “Medical Accelerator Projects at Michigan State University”, in Proc. PAC'89, Chicago, IL, USA, Mar. 1989, pp. 742-747.
[n] C. Leemann, R. Morgado, and R. Sah, “A New High Intensity K-Beam at the Bevatron”, in Proc. PAC'75, Washington D.C., USA, Mar. 1975, pp. 1484-1488.
For LaTeX
Use Complete Form
For BibTeX
References
- A. Schwinn et al., “FESA3 ÔÇô The New Front-End Software Framework at CERN and the FAIR Facility”, in Proc. 8th Int. Workshop on Personal Computers and Particle Accelerator Controls (PCaPAC'10), Saskatoon, Canada, Oct. 2010, paper WECOAA03, pp. 22-26.
- J. Welch, G. Codner, G. Dugan, A. Temnykh, A. Jain, and J. Muratore, “Tests and Measurements of the CESR Phase III Interaction Region Superconducting Magnets”, in Proc. 19th Particle Accelerator Conf. (PAC'01), Chicago, IL, USA, Jun. 2001, paper RPPH101, pp. 3472-3474.
- J. Y. Jung, S. Marks, and R. Schlueter, “Testing and Commissioning of the ALS Adjustable, Hysteresis-Free Chicane Magnet”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper FPAB084, pp. 3458-3460.
- A. I. Muminov, M. F. Vorogushin and D. V. Efremov, “Parameters, Present State and Application Perspectives of the U-250 Cyclotron”, in Proc. 13th Int. Cyclotron Conf. and Their Applications (Cyclotrons'92), Vancouver, Canada, Jul. 1992, paper I-08, pp. 50-53.
- J.-L. Vay et al., “New simulation capabilities of electron clouds in ion beams with large tune depression”, in Proc. 39th ICFA Advanced Beam Dynamics Workshop on High-Intensity and High-Brightness Hadron Beams (HB'06), Tsukuba, Japan, May-Jun. 2006, paper THAW01, pp. 279-282.
- A. Chanc?® et al., “Development of an Injector and a Magnetic Transfer Line in the Framework of Cilex”, in Proc. 7th Int. Particle Accelerator Conf. (IPAC'16), Busan, Korea, May 2016, pp. 2545-2547.
- A. Rai et al., “Operational Experience with the IUAC Linac”, in Proc. 14th Int. Conf. RF Superconductivity (SRF'09), Berlin, Germany, Sep. 2009, paper TUPPO025, pp. 244-248.
- O. Matilla et al., “ALBA Timing System - A Known Architecture with Fast Interlock System Upgrade”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper WEPMS023, pp. 1024-1027.
- S. Kumar and A. Mandal, “Transverse Emittance Measurement for Low Energy Ion Beams Using Quadrupole Scan Method”, in Proc. 6th Int. Particle Accelerator Conf. (IPAC'15), Richmond, VA, USA, May 2015, pp. 226-228.
- H. Tamura et al., “Further Study on a New Type of a Tuning-Free Cavity with an All-Pass Network”, in Proc. 1st Asian Particle Accelerator Conf. (APAC'98), Tsukuba, Japan, Mar. 1998, paper 5D016, pp. 420-422.
- J. J. Jamroz et al., “ALBA High Voltage Splitter - Power Distribution to Ion Pumps”, in Proc. 13th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'11), Grenoble, France, Oct. 2011, paper WEPMS024, pp. 1028-1031.
- P. Shrivastava, P. Mohania, J. Mulchandani, and Y. W. Wahnmode, “Performance of 6 MW Peak, 25kW Average Power Microwave System for 10 MeV, 10 kW Electron LINAC”, in Proc. 4th Asian Particle Accelerator Conf. (APAC'07), Indore, India, Jan.-Feb. 2007, paper THPMA015, pp. 649-651.
- T. Schenkel, W. G. Greenway, S. M. Lidia, K. Murphy, W. L. Waldron, and C. D. Weis, “Commissioning and Initial Experiments on NDCX-II”, in Proc. North American Particle Accelerator Conf. (NAPAC'13), Pasadena, CA, USA, Sep.-Oct. 2013, paper MOPAC19, pp. 108-110.
- M. Allen et al., “Commissioning of the PEP-II High Power RF Systems”, in Proc. 6th European Particle Accelerator Conf. (EPAC'98), Stockholm, Sweden, Jun. 1998, paper TUP19F, pp. 1805-1807.
- G. V. Dolbilov et al., “Project of SILUND-21 Linear Induction Accelerator for Generation of CLIC Driving Beam (Oral Poster)”, in Proc. 1994 Linear Accelerator Conf. (LINAC'94), Tsukuba, Japan, Aug. 1994, paper TU-01, pp. 357-359.
- H. Blosser et al., “Medical Accelerator Projects at Michigan State University”, in Proc. 13th Particle Accelerator Conf. (PAC'89), Chicago, IL, USA, Mar. 1989, pp. 742-747.
- C. Leemann, R. Morgado, and R. Sah, “A New High Intensity K-Beam at the Bevatron”, in Proc. 6th Particle Accelerator Conf. (PAC'75), Washington D.C., USA, Mar. 1975, pp. 1484-1488.
Back to search