Warning
The page numbers for some of these references could not be added automatically. You must provide the page numbers from the original proceedings which is located at JACoW.org, and substitute ‘pp. XX-XX’ with the correct page numbers.
Favourites
For Word
[n] T. L?Âhnert, A. J. Long, and J. R. Holt, “Generalising the High-Level Geometry System for Reflectometry Instruments at ISIS”, in Proc. ICALEPCS'19, New York, NY, USA, Oct. 2019, pp. 1302. doi:10.18429/JACoW-ICALEPCS2019-WEPHA091
[n] U. Iriso, M. Alvarez, F. F. B. Fernandez, A. Olmos, and F. Perez, “Diagnostics during the ALBA Storage Ring Commissioning”, in Proc. DIPAC'11, Hamburg, Germany, May 2011, paper TUOA02, pp. 280-282.
[n] A. Ijspeert, M. Begg, and T. M. Taylor, “Construction and Test of Superconducting Quadrupoles for the LEP2 Low-Beta Insertions”, in Proc. EPAC'94, London, UK, Jun.-Jul. 1994, pp. 2277-2280.
[n] Y. G. Song et al., “Development of a Machine Protection System for KOMAC Facility”, in Proc. ICALEPCS'17, Barcelona, Spain, Oct. 2017, pp. 334-336. doi:10.18429/JACoW-ICALEPCS2017-TUMPA02
[n] A. Cazan, P. Sch??tz, and U. Trinks, “Commissioning of the TRITRON”, in Proc. SRF'97, Padova, Italy, Oct. 1997, paper SRF97A32, pp. 276-281.
[n] S. H. Kim et al., “Development of a Short-Period Superconducting Undulator”, in Proc. PAC'03, Portland, OR, USA, May 2003, paper MPPG002, pp. 1020-1022.
[n] D. A. Swenson, B. C. Goplen, M. A. Paciotti, and J. E. Stovall, “Beam Measurements of the First Tank of LAMPF”, in Proc. PAC'71, Chicago, IL, USA, Mar. 1971, pp. 609-614.
[n] Y. Sun et al., “Commissioning of BEPCII superconducting RF system”, in Proc. SRF'07, Beijing, China, Oct. 2007, paper WEP16, pp. XX-XX.
For LaTeX
Use Complete Form
For BibTeX
References
- T. L?Âhnert, A. J. Long, and J. R. Holt, “Generalising the High-Level Geometry System for Reflectometry Instruments at ISIS”, in Proc. 17th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'19), New York, NY, USA, Oct. 2019, pp. 1302.
- U. Iriso, M. Alvarez, F. F. B. Fernandez, A. Olmos, and F. Perez, “Diagnostics during the ALBA Storage Ring Commissioning”, in Proc. 10th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC'11), Hamburg, Germany, May 2011, paper TUOA02, pp. 280-282.
- A. Ijspeert, M. Begg, and T. M. Taylor, “Construction and Test of Superconducting Quadrupoles for the LEP2 Low-Beta Insertions”, in Proc. 4th European Particle Accelerator Conf. (EPAC'94), London, UK, Jun.-Jul. 1994, pp. 2277-2280.
- Y. G. Song et al., “Development of a Machine Protection System for KOMAC Facility”, in Proc. 16th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'17), Barcelona, Spain, Oct. 2017, pp. 334-336.
- A. Cazan, P. Sch??tz, and U. Trinks, “Commissioning of the TRITRON”, in Proc. 8th Int. Conf. RF Superconductivity (SRF'97), Padova, Italy, Oct. 1997, paper SRF97A32, pp. 276-281.
- S. H. Kim et al., “Development of a Short-Period Superconducting Undulator”, in Proc. 20th Particle Accelerator Conf. (PAC'03), Portland, OR, USA, May 2003, paper MPPG002, pp. 1020-1022.
- D. A. Swenson, B. C. Goplen, M. A. Paciotti, and J. E. Stovall, “Beam Measurements of the First Tank of LAMPF”, in Proc. 4th Particle Accelerator Conf. (PAC'71), Chicago, IL, USA, Mar. 1971, pp. 609-614.
- Y. Sun et al., “Commissioning of BEPCII superconducting RF system”, in Proc. 13th Int. Conf. RF Superconductivity (SRF'07), Beijing, China, Oct. 2007, paper WEP16, pp. XX-XX.
Back to search