Favourites
For Word
[n] D. Olsson, ?à. Andersson, F. J. Cullinan, and P. F. Tavares, “Commissioning of the Bunch-by-Bunch Feedback System in the MAX IV 1.5 GeV Ring”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 3688-3691. doi:10.18429/JACoW-IPAC2018-THPAL028
[n] H. Alamprese, J. Qiang, and Y. Hao, “Preliminary study of space charge and beam-beam interplay in a collider ring”, in Proc. NAPAC'25, Sacramento, California, USA, Aug. 2025, pp. 554-558. doi:10.18429/JACoW-NAPAC2025-TUP080
[n] S. Thorin et al., “Beam Commissioning and Initial Measurements on the MAX IV 3 GeV Linac”, in Proc. FEL'15, Daejeon, Korea, Aug. 2015, pp. 375-378. doi:10.18429/JACoW-FEL2015-TUP014
For LaTeX
Use Complete Form
For BibTeX
References
- D. Olsson, ?à. Andersson, F. J. Cullinan, and P. F. Tavares, “Commissioning of the Bunch-by-Bunch Feedback System in the MAX IV 1.5 GeV Ring”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 3688-3691.
- H. Alamprese, J. Qiang, and Y. Hao, “Preliminary study of space charge and beam-beam interplay in a collider ring”, in Proc. 6th North American Particle Accelerator Conference (NAPAC'25), Sacramento, California, USA, Aug. 2025, pp. 554-558.
- S. Thorin et al., “Beam Commissioning and Initial Measurements on the MAX IV 3 GeV Linac”, in Proc. 37th Int. Free Electron Laser Conf. (FEL'15), Daejeon, Korea, Aug. 2015, pp. 375-378.
Back to search