Favourites
For Word
[n] M. T. Li, Y. W. An, S. Wang, and S. Y. Xu, “The Synchronization between BPMs and Corrector Power Supplies in AC Mode of RCS of CSNS”, in Proc. IPAC'19, Melbourne, Australia, May 2019, pp. 3164-3166. doi:10.18429/JACoW-IPAC2019-WEPTS029
[n] J. Zhao et al., “An Intermediate Structure SFRFQ Between RFQ and DTL”, in Proc. LINAC'08, Victoria, Canada, Sep.-Oct. 2008, paper MOP025, pp. 118-120.
[n] D. Arranger et al., “The MIRI Imager Ground Support Equipment Control System Based on PCs”, in Proc. ICALEPCS'07, Oak Ridge, TN, USA, Oct. 2007, paper TPPB06, pp. 172-174.
[n] J.-C. Chang and Y.-H. Liu, “Finite Element Analysis on Beam-Induced Heat Load in in-Vacuum Undulators with a Small Magnet Gap”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 3760-3762. doi:10.18429/JACoW-IPAC2018-THPAL052
For LaTeX
Use Complete Form
For BibTeX
References
- M. T. Li, Y. W. An, S. Wang, and S. Y. Xu, “The Synchronization between BPMs and Corrector Power Supplies in AC Mode of RCS of CSNS”, in Proc. 10th Int. Particle Accelerator Conf. (IPAC'19), Melbourne, Australia, May 2019, pp. 3164-3166.
- J. Zhao et al., “An Intermediate Structure SFRFQ Between RFQ and DTL”, in Proc. 24th Linear Accelerator Conf. (LINAC'08), Victoria, Canada, Sep.-Oct. 2008, paper MOP025, pp. 118-120.
- D. Arranger et al., “The MIRI Imager Ground Support Equipment Control System Based on PCs”, in Proc. 11th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'07), Oak Ridge, TN, USA, Oct. 2007, paper TPPB06, pp. 172-174.
- J.-C. Chang and Y.-H. Liu, “Finite Element Analysis on Beam-Induced Heat Load in in-Vacuum Undulators with a Small Magnet Gap”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 3760-3762.
Back to search