Favourites
For Word
[n] M. Kuntzsch et al., “Concept of Femtosecond Timing and Synchronization Scheme at ELBE”, in Proc. IPAC'11, San Sebastian, Spain, Sep. 2011, paper MOPO037, pp. 565-567.
[n] L. Zhao, B. Cluggish, and J. S. Kim, “2D Extension of GEM (The Generalized ECR Ion Source Modeling Code)”, in Proc. PAC'07, Albuquerque, NM, USA, Jun. 2007, paper TUPAS079, pp. 1832-1834.
[n] C. Deibele et al., “Calibration of the analog beam-signal hardware for the credited engineered beam power limit system at the Proton Power Upgrade Project at the Spallation Neutron Source”, in Proc. LINAC'24, Chicago, IL, USA, Aug. 2024, pp. 718-721. doi:10.18429/JACoW-LINAC2024-THPB041
[n] M. Sapinski et al., “Ionization Profile Monitor Simulations - Status and Future Plans”, in Proc. IBIC'16, Barcelona, Spain, Sep. 2016, pp. 520-523. doi:10.18429/JACoW-IBIC2016-TUPG71
For LaTeX
Use Complete Form
For BibTeX
References
- M. Kuntzsch et al., “Concept of Femtosecond Timing and Synchronization Scheme at ELBE”, in Proc. 2nd Int. Particle Accelerator Conf. (IPAC'11), San Sebastian, Spain, Sep. 2011, paper MOPO037, pp. 565-567.
- L. Zhao, B. Cluggish, and J. S. Kim, “2D Extension of GEM (The Generalized ECR Ion Source Modeling Code)”, in Proc. 22nd Particle Accelerator Conf. (PAC'07), Albuquerque, NM, USA, Jun. 2007, paper TUPAS079, pp. 1832-1834.
- C. Deibele et al., “Calibration of the analog beam-signal hardware for the credited engineered beam power limit system at the Proton Power Upgrade Project at the Spallation Neutron Source”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 718-721.
- M. Sapinski et al., “Ionization Profile Monitor Simulations - Status and Future Plans”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 520-523.
Back to search