Favourites
For Word
[n] W. Graves et al., “Results from CXLS commissioning”, in Proc. IPAC'24, Nashville, TN, USA, May 2024, pp. 981-984. doi:10.18429/JACoW-IPAC2024-TUCN3
[n] J. L. LaClare, “Commissioning and Performance of the ESRF”, in Proc. PAC'93, Washington D.C., USA, Mar. 1993, pp. 1427-1432.
[n] H. Fujita et al., “Slow Extraction System of Stretcher Ring, KSR”, in Proc. EPAC'98, Stockholm, Sweden, Jun. 1998, paper MOP19C, pp. 2120-2122.
[n] F. Grespan et al., “ESS DTL: final installation and first commissioning results up to 74 MeV”, in Proc. LINAC'24, Chicago, IL, USA, Aug. 2024, pp. 461-464. doi:10.18429/JACoW-LINAC2024-TUPB068
[n] N. L. Leicester et al., “Development and Testing of Split 6 GHz Cavities With Niobium Coatings”, in Proc. SRF'23, Grand Rapids, MI, USA, Jun. 2023, pp. 51-55. doi:10.18429/JACoW-SRF2023-MOPMB001
For LaTeX
Use Complete Form
For BibTeX
References
- W. Graves et al., “Results from CXLS commissioning”, in Proc. 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper TUCN3, pp. 981-984.
- J. L. LaClare, “Commissioning and Performance of the ESRF”, in Proc. 15th Particle Accelerator Conf. (PAC'93), Washington D.C., USA, Mar. 1993, pp. 1427-1432.
- H. Fujita et al., “Slow Extraction System of Stretcher Ring, KSR”, in Proc. 6th European Particle Accelerator Conf. (EPAC'98), Stockholm, Sweden, Jun. 1998, paper MOP19C, pp. 2120-2122.
- F. Grespan et al., “ESS DTL: final installation and first commissioning results up to 74 MeV”, in Proc. 32nd Linear Accelerator Conf. (LINAC'24), Chicago, IL, USA, Aug. 2024, pp. 461-464.
- N. L. Leicester et al., “Development and Testing of Split 6 GHz Cavities With Niobium Coatings”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper MOPMB001, pp. 51-55.
Back to search