Warning
The page numbers for some of these references could not be added automatically. You must provide the page numbers from the original proceedings which is located at JACoW.org, and substitute ‘pp. XX-XX’ with the correct page numbers.
Favourites
For Word
[n] K. Cerff, W. Mexner, and T. Spangenberg, “The ANKA B-Field Test Facility Control System, based on a SPEC Macro Package Enhanced Setup”, in Proc. PCaPAC'10, Saskatoon, Canada, Oct. 2010, paper THPL014, pp. 156-158.
[n] E. Boltezar et al., “Performance of the New CERN 50 MeV Linac”, in Proc. PAC'79, San Francisco, CA, USA, Mar. 1979, pp. 3674-3677.
[n] A. Facco et al., “The Matching Line Between the RFQ and the IH Linac of the CERN Lead Ion Facility”, in Proc. LINAC'94, Tsukuba, Japan, Aug. 1994, paper TH-15, pp. 731-733.
[n] J. D. Fox, L. Beckman, D. Teytelman, D. Van Winkle, and A. Young, “Development and Testing of a Low Group-delay Woofer Channel for PEP-II”, in Proc. EPAC'04, Lucerne, Switzerland, Jul. 2004, paper THPLT155, pp. 2822-2824.
[n] D. J. Larson and D. W. Hewett, “Particle Trajectories through MIRRORTRON Configurations”, in Proc. PAC'91, San Francisco, CA, USA, May 1991, pp. 2581-2583.
[n] R. Hentschel, P. Meissner, J. Rassow, H. Sack, W. Sauerwein, and C. Streffer, “Plans for the German National Neutron Therapy Centre with a Hospital-Based 70 MeV Proton Cyclotron at University Hospital Essen / Germany”, in Proc. Cyclotrons'98, Caen, France, Jun. 1998, paper A-03, pp. 21-23.
[n] R. Eichhorn et al., “Results from a 850 C Heat Treatment and Operational Findings from the 3 GHZ SRF Cavities at the S-DALINAC”, in Proc. SRF'07, Beijing, China, Oct. 2007, paper TUP19, pp. XX-XX.
For LaTeX
Use Complete Form
For BibTeX
References
- K. Cerff, W. Mexner, and T. Spangenberg, “The ANKA B-Field Test Facility Control System, based on a SPEC Macro Package Enhanced Setup”, in Proc. 8th Int. Workshop on Personal Computers and Particle Accelerator Controls (PCaPAC'10), Saskatoon, Canada, Oct. 2010, paper THPL014, pp. 156-158.
- E. Boltezar et al., “Performance of the New CERN 50 MeV Linac”, in Proc. 8th Particle Accelerator Conf. (PAC'79), San Francisco, CA, USA, Mar. 1979, pp. 3674-3677.
- A. Facco et al., “The Matching Line Between the RFQ and the IH Linac of the CERN Lead Ion Facility”, in Proc. 1994 Linear Accelerator Conf. (LINAC'94), Tsukuba, Japan, Aug. 1994, paper TH-15, pp. 731-733.
- J. D. Fox, L. Beckman, D. Teytelman, D. Van Winkle, and A. Young, “Development and Testing of a Low Group-delay Woofer Channel for PEP-II”, in Proc. 9th European Particle Accelerator Conf. (EPAC'04), Lucerne, Switzerland, Jul. 2004, paper THPLT155, pp. 2822-2824.
- D. J. Larson and D. W. Hewett, “Particle Trajectories through MIRRORTRON Configurations”, in Proc. 14th Particle Accelerator Conf. (PAC'91), San Francisco, CA, USA, May 1991, pp. 2581-2583.
- R. Hentschel, P. Meissner, J. Rassow, H. Sack, W. Sauerwein, and C. Streffer, “Plans for the German National Neutron Therapy Centre with a Hospital-Based 70 MeV Proton Cyclotron at University Hospital Essen / Germany”, in Proc. 15th Int. Cyclotron Conf. and Their Applications (Cyclotrons'98), Caen, France, Jun. 1998, paper A-03, pp. 21-23.
- R. Eichhorn et al., “Results from a 850 C Heat Treatment and Operational Findings from the 3 GHZ SRF Cavities at the S-DALINAC”, in Proc. 13th Int. Conf. RF Superconductivity (SRF'07), Beijing, China, Oct. 2007, paper TUP19, pp. XX-XX.
Back to search