Favourites
For Word
[n] R. Bacher, “Commissioning of the New Control Systems for the PETRA3 Accelerator Complex at DESY”, in Proc. ICALEPCS'09, Kobe, Japan, Oct. 2009, paper MOB004, pp. 7-9.
[n] S. Wurtele and M. Sessler, “Transverse Instability in a 50GeV x 50GeV Muon Collider Ring”, in Proc. PAC'99, New York, NY, USA, Mar. 1999, paper THP45, pp. 3056-3058.
[n] B. N. Kosciuk, A. Blednykh, and S. Seletskiy, “Construction and Operational Performance of a Horizontally Adjustable Beam Profile Monitor at NSLS-II”, in Proc. IBIC'14, Monterey, CA, USA, Sep. 2014, paper MOPF07, pp. 55-58.
[n] M. Schlapp et al., “A New 14 GHz Electron-Cyclotron-Resonance Ion Source (ECRIS) for the Heavy Ion Accelerator Facility ATLAS”, in Proc. PAC'97, Vancouver, Canada, May 1997, paper 6W003, pp. 2702-2704.
[n] M. Kelly et al., “Installation and commissioning of the APS-U bunch lengthening system”, in Proc. IPAC'24, Nashville, TN, USA, May 2024, pp. 2713-2716. doi:10.18429/JACoW-IPAC2024-WEPS10
[n] K. Takayama et al., “Present Status of the Induction Synchrotron Experiment in the KEK PS”, in Proc. EPAC'06, Edinburgh, UK, Jun. 2006, paper MOPCH119, pp. 324-326.
For LaTeX
Use Complete Form
For BibTeX
References
- R. Bacher, “Commissioning of the New Control Systems for the PETRA3 Accelerator Complex at DESY”, in Proc. 12th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'09), Kobe, Japan, Oct. 2009, paper MOB004, pp. 7-9.
- S. Wurtele and M. Sessler, “Transverse Instability in a 50GeV x 50GeV Muon Collider Ring”, in Proc. 18th Particle Accelerator Conf. (PAC'99), New York, NY, USA, Mar. 1999, paper THP45, pp. 3056-3058.
- B. N. Kosciuk, A. Blednykh, and S. Seletskiy, “Construction and Operational Performance of a Horizontally Adjustable Beam Profile Monitor at NSLS-II”, in Proc. 3rd Int. Beam Instrumentation Conf. (IBIC'14), Monterey, CA, USA, Sep. 2014, paper MOPF07, pp. 55-58.
- M. Schlapp et al., “A New 14 GHz Electron-Cyclotron-Resonance Ion Source (ECRIS) for the Heavy Ion Accelerator Facility ATLAS”, in Proc. 17th Particle Accelerator Conf. (PAC'97), Vancouver, Canada, May 1997, paper 6W003, pp. 2702-2704.
- M. Kelly et al., “Installation and commissioning of the APS-U bunch lengthening system”, in Proc. 15th Int. Particle Accelerator Conf. (IPAC'24), Nashville, TN, USA, May 2024, paper WEPS10, pp. 2713-2716.
- K. Takayama et al., “Present Status of the Induction Synchrotron Experiment in the KEK PS”, in Proc. 10th European Particle Accelerator Conf. (EPAC'06), Edinburgh, UK, Jun. 2006, paper MOPCH119, pp. 324-326.
Back to search