Favourites
For Word
[n] S. Casalbuoni, S. Gerstl, A. W. Grau, T. Holubek, and D. Saez de Jauregui, “Beam Heat Load and Pressure in the Superconducting Undulator Installed at ANKA”, in Proc. IPAC'12, New Orleans, LA, USA, May 2012, paper MOPPP068, pp. 717-719.
[n] W. X. Cheng, B. Bacha, K. Ha, and Y. Li, “Fast Glitch Detection of Coupled Bunch Instabilities and Orbit Motions”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 1829-1832. doi:10.18429/JACoW-IPAC2018-WEPAF010
[n] F. Hoguin and S. Deghaye, “Solving the Synchronization Problem in Multi-Core Embedded Real-Time Systems”, in Proc. ICALEPCS'15, Melbourne, Australia, Oct. 2015, pp. 942-946. doi:10.18429/JACoW-ICALEPCS2015-WEPGF102
[n] F. Senee et al., “Increase of IPHI Beam Power at CEA Saclay”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 694-696. doi:10.18429/JACoW-IPAC2018-TUPAF016
For LaTeX
Use Complete Form
For BibTeX
References
- S. Casalbuoni, S. Gerstl, A. W. Grau, T. Holubek, and D. Saez de Jauregui, “Beam Heat Load and Pressure in the Superconducting Undulator Installed at ANKA”, in Proc. 3rd Int. Particle Accelerator Conf. (IPAC'12), New Orleans, LA, USA, May 2012, paper MOPPP068, pp. 717-719.
- W. X. Cheng, B. Bacha, K. Ha, and Y. Li, “Fast Glitch Detection of Coupled Bunch Instabilities and Orbit Motions”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 1829-1832.
- F. Hoguin and S. Deghaye, “Solving the Synchronization Problem in Multi-Core Embedded Real-Time Systems”, in Proc. 15th Int. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS'15), Melbourne, Australia, Oct. 2015, pp. 942-946.
- F. Senee et al., “Increase of IPHI Beam Power at CEA Saclay”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 694-696.
Back to search