[n] A. Schaller, J. Fitzek, D. Lorenz, and F. Wolf, “Optimized Calculation of Timing for Parallel Beam Operation at the FAIR Accelerator Complex”, in Proc. ICALEPCS'17, Barcelona, Spain, Oct. 2017, pp. 411-415. doi:10.18429/JACoW-ICALEPCS2017-TUPHA019
[n] R. L. Brown et al., “Resonance Control for the Coupled Cavity Linac and Drift Tube Linac Structures of the Spallation Neutron Source Linac Using a Closed-Loop Water Cooling System”, in Proc. PAC'01, Chicago, IL, USA, Jun. 2001, paper TPAH095, pp. 1429-1431.
Use Complete Form