Favourites
For Word
[n] M. Bhattacharjee et al., “First results from the gas jet coupled 2.45 GHz ECRIS for online radioactive ion beam production at VECC RIB facility”, presented at the ECRIS'22, Ahmedabad, India, Oct. 2022, paper FRT8AUCO25, unpublished.
[n] J. C. Dooling et al., “Calibration and Simulation of the LCLS Undulator Beam Loss Monitors using APS Accelerators”, in Proc. PAC'11, New York, NY, USA, Mar.-Apr. 2011, paper MOP273, pp. 618-620.
[n] O. R. Jones, “Beam Diagnostics Challenges for Beam Dynamics Studies”, in Proc. IBIC'16, Barcelona, Spain, Sep. 2016, pp. 577-582. doi:10.18429/JACoW-IBIC2016-WEBL01
[n] A. Winter, “Sub-ps Timing and Synchronization Systems for Longitudinal Electron Bunch Profile Measurements”, in Proc. DIPAC'07, Venice, Italy, May 2007, paper WEO1A01, pp. 204-208.
[n] H. W. Schreuder and B. D. Taenzer, “Computer Control at the KVI Cyclotron”, in Proc. Cyclotrons'81, Caen, France, Sep. 1981, paper FC-03, pp. 571-573.
[n] K. Kasprzak et al., “Test-Stand for Conditioning of Fundamental Power Couplers at DESY”, in Proc. SRF'23, Grand Rapids, MI, USA, Jun. 2023, pp. 797-800. doi:10.18429/JACoW-SRF2023-WEPWB092
[n] V. Papadimitriou et al., “Design Status of the LBNF/DUNE Beamline”, in Proc. IPAC'18, Vancouver, Canada, Apr.-May 2018, pp. 902-904. doi:10.18429/JACoW-IPAC2018-TUPAF075
[n] J. Biggs, “A Magnetically Switched Kicker for Proton Extraction”, in Proc. PAC'89, Chicago, IL, USA, Mar. 1989, pp. 402-405.
For LaTeX
Use Complete Form
For BibTeX
References
- M. Bhattacharjee et al., “First results from the gas jet coupled 2.45 GHz ECRIS for online radioactive ion beam production at VECC RIB facility”, presented at the 25th International Workshop on ECR Ion Sources (ECRIS'22), Ahmedabad, India, Oct. 2022, paper FRT8AUCO25, unpublished.
- J. C. Dooling et al., “Calibration and Simulation of the LCLS Undulator Beam Loss Monitors using APS Accelerators”, in Proc. 24th Particle Accelerator Conf. (PAC'11), New York, NY, USA, Mar.-Apr. 2011, paper MOP273, pp. 618-620.
- O. R. Jones, “Beam Diagnostics Challenges for Beam Dynamics Studies”, in Proc. 5th Int. Beam Instrumentation Conf. (IBIC'16), Barcelona, Spain, Sep. 2016, pp. 577-582.
- A. Winter, “Sub-ps Timing and Synchronization Systems for Longitudinal Electron Bunch Profile Measurements”, in Proc. 8th European Workshop on Beam Diagnostics and Instrumentation for Particle Accelerators (DIPAC'07), Venice, Italy, May 2007, paper WEO1A01, pp. 204-208.
- H. W. Schreuder and B. D. Taenzer, “Computer Control at the KVI Cyclotron”, in Proc. 9th Int. Cyclotron Conf. and Their Applications (Cyclotrons'81), Caen, France, Sep. 1981, paper FC-03, pp. 571-573.
- K. Kasprzak et al., “Test-Stand for Conditioning of Fundamental Power Couplers at DESY”, in Proc. 21th Int. Conf. RF Superconductivity (SRF'23), Grand Rapids, MI, USA, Jun. 2023, paper WEPWB092, pp. 797-800.
- V. Papadimitriou et al., “Design Status of the LBNF/DUNE Beamline”, in Proc. 9th Int. Particle Accelerator Conf. (IPAC'18), Vancouver, Canada, Apr.-May 2018, pp. 902-904.
- J. Biggs, “A Magnetically Switched Kicker for Proton Extraction”, in Proc. 13th Particle Accelerator Conf. (PAC'89), Chicago, IL, USA, Mar. 1989, pp. 402-405.
Back to search